FAA Administrator Babbitt Helps Break Ground On Oakland Control Tower | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Sat, Oct 16, 2010

FAA Administrator Babbitt Helps Break Ground On Oakland Control Tower

California Airports Receive $37 Million In ARA Grants

FAA Administrator Randy Babbitt helped break ground Friday for a new air traffic control tower at Oakland International Airport funded by the American Recovery and Reinvestment Act (ARRA). The Oakland International Airport ARRA grant, totaling $33.2 million, is the FAA's largest, single Recovery Act award.

"This Recovery Act project will make a difference for the Oakland area economy," said U.S. Transportation Secretary Ray LaHood. "People will be put to work building an environmentally friendly tower that will better serve the airport and the community."

The Recovery Act grant will pay for construction of the 236-foot-tall tower and a 13,000 square-foot base building, as well as some equipment for the facility. "This brand new, modernized tower will give air traffic controllers a better view of the airfield and help improve airport efficiency," said Babbitt. "The Recovery Act is allowing us to make needed investments at airports around the country."

Two air traffic control towers currently serve Oakland International Airport. A 158-foot-tall tower on the southern portion of the airfield was built in 1962 as a part of a terminal expansion project. In 1972, construction of a large hangar blocked some views from the south tower, requiring the Port of Oakland to build a second tower to handle traffic on the north runways. Replacing both towers with a single one will improve air traffic operations and reduce operating costs. The FAA expects to start using the new tower in 2013.

The new tower will feature a number of environmental benefits, including a covered parking structure with solar panels on the roof of the base building, which will provide power for the tower and its electrical systems. The tower also will have a geothermal heating system and a rainwater storage system.


Babbitt

In addition to the Oakland tower funding, the FAA provided a total of $37 million in Recovery Act grants to Bay Area airports.
 
Oakland International Airport received a $14.9 million ARRA grant to rebuild a large apron area used by airlines and cargo carriers and to reconfigure a taxiway. By replacing old apron pavement, the project will improve efficiency and allow larger aircraft to use the taxiway.

San Francisco International Airport received ARRA grants totaling $14.5 million to resurface two runways. The projects leveled out the runways, which tend to settle over time because of ground conditions. The new asphalt concrete resurface also will prevent unexpected runway shutdowns due to pavement breakdown, and will guard against crumbling pavement debris that can damage aircraft.

In San Jose, a $5.2 million Recovery Act grant is funding the extension of a taxiway at Norman Y. Mineta San Jose International Airport. This project will improve safety by eliminating the need for private planes to cross a runway while taxiing to an engine run-up area. An additional $2.4 million in Recovery Act funds is modernizing and making safety upgrades at area facilities and airports.

Nationwide, $1.3 billion in Recovery Act money has been made available for both airport improvement projects and air traffic control facility and system upgrades. These Recovery Act grants have been distributed to airports that serve commercial passengers, cargo and general aviation.

FMI: www.faa.gov

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC