USAF Research Lab Sponsors GE Aviation For Prototype Program | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Fri, Jan 25, 2019

USAF Research Lab Sponsors GE Aviation For Prototype Program

Developing Teaming-Enabled Architectures for Manned-Unmanned Systems

A Project Task Assignment for the Teaming-Enabled Architectures for Manned-Unmanned Systems (TEAMS) prototype program was recently awarded to GE Aviation. The project is under the authority of the Base Vertical Lift Consortium Project Agreement and is sponsored by the U.S. Air Force Research Lab (AFRL).

“The TEAMS program is a tremendous opportunity for GE to work closely with AFRL and our industry partners to prototype architectures that will enable the next generation of Manned-Unmanned Teaming capabilities,” says John Kormash, director of Advanced & Special Programs for GE Aviation. “GE’s experience and investments in the areas of architecture, modeling, simulation, and system instantiations will enhance the AFRL’s objectives of developing open, flexible, and scalable solutions for tomorrow’s autonomous vehicles.”

TEAMS is an architectural modeling and prototyping effort under the AFRL’s Flexible, Assured Manned-Unmanned Systems (FAMUS) program. FAMUS intends to lay a technical foundation for an operational reality where a heterogeneous, multi-man, multi-machine team-of-teams can perform a range of missions in a flexible and assured manner.

By prototyping an iterative, architecture-centric, and model-based approach under TEAMS, FAMUS intends to define the architectures, processes, methods, tools, and environments necessary to rapidly mature and affordably transition increasingly complex manned-unmanned teaming technologies.

Also contributing to this prototype are team members Modern Technology Solutions (MTSI), Scientific Systems Company (SSCI), Dependable Computing and GE Global Research Center (GRC). The contract period of performance is 24 months and will be executed at GE Aviation’s Grand Rapids, Michigan, Avionics site as well as team member locations. This effort is being sponsored by the U.S. Government under Other Transaction number W15QKN-16-9-1001 between Vertical Lift Consortium, Inc and the Government.

(Source: GE Aviation news release)

FMI: www.ge.com/aviation

Advertisement

More News

Aero-News: Quote of the Day (05.09.24)

"Fly-by-wire flight, coupled with additional capability that are being integrated into ALFA, provide a great foundation for Bell to expand on its autonomous capabilities. This airc>[...]

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Linx (05.09.24)

Aero Linx: B-21 Raider The B-21 Raider will be a dual-capable penetrating strike stealth bomber capable of delivering both conventional and nuclear munitions. The B-21 will form th>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC