NASA Delays Hubble Repair Mission Until Fall | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Sat, May 03, 2008

NASA Delays Hubble Repair Mission Until Fall

Fuel Tank Rework Affects Future Flights

Delays in production to the last several, redesigned external fuel tanks slated to fly in the space shuttle program have forced NASA to move off a mission to service the Hubble Space Telescope.

According to The Associated Press, NASA will delay the mission, originally slated for late August 2008, by at least one month. Atlantis and a crew of seven will take flight at the end of September at the earliest, said Shuttle program manager John Shannon.

"It's a small price to pay to tell you the truth, four to five weeks, for all the improvements that we're getting on this tank," he said.

As ANN reported in March, the upcoming STS-124 mission onboard Discovery, scheduled to lift off later this month, will be the first launch to utilize an "in-line" external tank, which sports built-in modifications intended to reduce the risks of catastrophic damage to the orbiter from chunks of insulating foam.

Previous tanks used since Discovery's first Return to Flight mission in July 2005, following the 2003 loss of Columbia, featured a number of modifications intended to reduce foam shedding... but STS-124 will be the first to use an external tank designed from the ground-up to incorporate such changes. The new design includes a new protuberance air load (PAL) ramp design, and titanium O2 line support brackets... both measures intended to resist ice formation.

Tanks slated for subsequent missions have suffered from slowdowns in manufacturing, however, as workers address new tank construction processes, and other issues related to shuttle modifications. NASA will likely receive the external tank for the Hubble mission, STS-125, in time to make the August 28 launch date... but due to the unique nature of the Hubble servicing mission, the space agency has also called for the shuttle Endeavour to be launch-ready as well, should Atlantis suffer damage that would prevent the orbiter from reentering the atmosphere.

The tank slated for that emergency mission -- designated STS-400 -- won't be available in time for the August launch date, hence the delay.

STS-125 will be the first shuttle mission not to dock at the ISS since the Columbia disaster, and is slated to be the last such flight before the shuttle fleet is retired in September 2010. The Hubble is in a much higher orbit than the ISS, and the shuttle does not carry enough fuel to move to a different orbit to dock with the station and "lifeboat" the crew.

FMI: www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Term (04.24.24): Runway Lead-in Light System

Runway Lead-in Light System Runway Lead-in Light System Consists of one or more series of flashing lights installed at or near ground level that provides positive visual guidance a>[...]

ANN's Daily Aero-Linx (04.24.24)

Aero Linx: Aviation Without Borders Aviation Without Borders uses its aviation expertise, contacts and partnerships to enable support for children and their families – at hom>[...]

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

Classic Aero-TV: Best Seat in The House -- 'Inside' The AeroShell Aerobatic Team

From 2010 (YouTube Version): Yeah.... This IS A Really Cool Job When ANN's Nathan Cremisino took over the lead of our Aero-TV teams, he knew he was in for some extra work and a lot>[...]

Airborne Affordable Flyers 04.18.24: CarbonCub UL, Fisher, Affordable Flyer Expo

Also: Junkers A50 Heritage, Montaer Grows, Dynon-Advance Flight Systems, Vans' Latest Officially, the Carbon Cub UL and Rotax 916 iS is now in its 'market survey development phase'>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC