FAA Issues Policy Statement On Decommissioning VORs | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Fri, Aug 12, 2016

FAA Issues Policy Statement On Decommissioning VORs

Cites Increase In RNAV Routes Coming Online In The NAS As Reason For The Action

The FAA has issued a policy statement on its proposed reduction of VORs in the U.S.

The document outlines the selection criteria for VORs that may be shut down as part of the VOR MON (Minimal Operational Network) Implementation Program and United States (U.S.) National Airspace System (NAS) Efficient Streamline Services Initiative.

In 2011, the FAA announced that, as part of a NAS Efficient Streamlined Services Initiative, the number of conventional NAVAIDs would be reduced while more efficient Area Navigation (RNAV) routes and procedures are implemented throughout the NAS. The FAA noted its intention to convene a working group to assist in developing a candidate list of VORs for discontinuance using relevant operational, safety, cost, and economic criteria. Interested parties were invited to participate in the review of this policy and planning effort by submitting written comments on the proposal. The agency reviewed all 330 comments it received to its proposal.

The following criteria were used by the FAA to determine which VORs would be retained as a part of the MON:

  • Retain VORs to perform Instrument Landing System (ILS), Localizer (LOC), or VOR approaches supporting MON airports at suitable destinations within 100 NM of any location within the CONUS. Selected approaches would not require Automatic Direction Finder (ADF), Distance Measuring Equipment (DME), Radar, or GPS.
  • Retain VORs to support international oceanic arrival routes.
  • Retain VORs to provide coverage at and above 5,000 ft AGL.
  • Retain most VORs in the Western U.S. Mountainous Area (WUSMA), specifically those anchoring Victor airways through high elevation terrain.
  • Retain VORs required for military use.
  • VORs outside of the CONUS were not considered for discontinuance under the VOR MON Implementation Program.
  • The following considerations were used to supplement the VOR MON criteria above:
  • Only FAA owned/operated VORs were considered for discontinuance.
  • Co-located DME and Tactical Air Navigation (TACAN) systems will generally be retained when the VOR service is terminated.
  • Co-located communication services relocated or reconfigured to continue transmitting their services.

The FAA says in the document that it remains committed to the plan to retain an optimized network of VOR NAVAIDs. The MON will enable pilots to revert from Performance Based Navigation (PBN) to conventional navigation for approach, terminal and en route operations in the event of a GPS outage and supports the NAS transition from VOR-based routes to a more efficient PBN structure consistent with NextGen goals and the NAS Efficient Streamlined Services Initiative.

FMI: Full Document Including List

Advertisement

More News

ANN's Daily Aero-Linx (05.04.24)

Aero Linx: JAARS Nearly 1.5 billion people, using more than 5,500 languages, do not have a full Bible in their first language. Many of these people live in the most remote parts of>[...]

NTSB Final Report: Quest Aircraft Co Inc Kodiak 100

'Airplane Bounced Twice On The Grass Runway, Resulting In The Nose Wheel Separating From The Airplane...' Analysis: The pilot reported, “upon touchdown, the plane jumped back>[...]

Aero-News: Quote of the Day (05.04.24)

"Burt is best known to the public for his historic designs of SpaceShipOne, Voyager, and GlobalFlyer, but for EAA members and aviation aficionados, his unique concepts began more t>[...]

Aero-News: Quote of the Day (05.05.24)

"Polaris Dawn, the first of the program’s three human spaceflight missions, is targeted to launch to orbit no earlier than summer 2024. During the five-day mission, the crew >[...]

Read/Watch/Listen... ANN Does It All

There Are SO Many Ways To Get YOUR Aero-News! It’s been a while since we have reminded everyone about all the ways we offer your daily dose of aviation news on-the-go...so he>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC