AD: Airbus SAS Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Fri, Aug 30, 2019

AD: Airbus SAS Airplanes

AD NUMBER: 2019-14-08

PRODUCT: All Airbus SAS Model A300 B4-600, B4-600R, and F4-600R series airplanes, and Model A300 C4- 605R Variant F airplanes (collectively called Model A300-600 series airplanes); and Model A310 series airplanes.

ACTION: Final Rule.

SUMMARY: The FAA is superseding Airworthiness Directive (AD) 2016-07-22, which applied to the aircraft listed above.

AD 2016-07-22 required modifying the electrical routing installation at the right-hand (RH) and left-hand (LH) wings to achieve a minimum distance between wiring bundles and surrounding structures.

This new AD retains the requirements of AD 2016-07-22 and, for certain airplanes, adds a requirement to further modify the electrical installations in both wings, as specified in a European Aviation Safety Agency (EASA) AD, which is incorporated by reference.

This AD was prompted by reports of missing installation information for certain airplanes.

DATES: This AD is effective October 2, 2019.

COST: The FAA estimates that this AD affects 123 airplanes of U.S. registry. Operators may incur the following costs in order to comply with this AD:

  • Retained actions from AD 2016-07-22: Labor: 56 work-hours × $85 per hour = $4,760. Parts: Up to $18,000. Cost per aircraft: Up to $22,760.
  • New actions: Labor: Up to 38 work-hours × $85 per hour = Up to $3,230. Parts: Up to $29,547. Cost per aircraft: Up to $32,777.
FMI: AD

Advertisement

More News

ANN's Daily Aero-Term (05.10.24): Takeoff Roll

Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]

Aero-News: Quote of the Day (05.10.24)

“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]

Airborne 05.06.24: Gone West-Dick Rutan, ICON BK Update, SpaceX EVA Suit

Also: 1800th E-Jet, Uncle Sam Sues For Landing Gear, Embraer Ag Plane, Textron Parts A friend of the family reported that Lt. Col. (Ret.) Richard Glenn Rutan flew west on Friday, M>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Aero-News: Quote of the Day (05.11.24)

"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC