Risky Repair To ISS Solar Wing Completed | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.20.24

Airborne-Unlimited-05.28.24

Airborne-FlightTraining-05.29.24 Airborne-Unlimited-05.30.24

Airborne-Unlimited-05.24.24

Sun, Nov 04, 2007

Risky Repair To ISS Solar Wing Completed

Score One For NASA Ingenuity

Discovery astronauts repaired a damaged solar panel on a potentially dangerous venture outside the space station on Saturday, accomplishing the task in a little more than seven hours.

As ANN reported, a section of the panel snagged and ripped earlier this week when the accordion-like sheet was unfurled.

NASA astronaut Scott Parazynski used needle-nose pliers, wire cutters and a spatula-like device to free a stuck solar panel, according to a Bloomberg report.

Parazynski, 46, made the repairs while standing at the end of a boom attached to the station's robotic arm, measuring almost 60-feet long. He had to avoid touching the panels with his suit or the metal tools during the 7-hour, 19-minute spacewalk, as they could transmit electricity from the solar array.

The panel, which helps supply power to the orbiting outpost, was worked on by astronauts aboard the International Space Station. Prior to the repair, it couldn't be unfurled completely though it was generating electricity at 97 percent capacity, according to NASA.

Spacewalker Doug Wheelock, who made his third spacewalk, was on the truss near the solar array, assisting Parazynski and talking to crew inside the station who steered the robotic arm. Both are members of the STS-120 crew onboard the shuttle Discovery.

Parazynski installed five hinge stabilizers, or "cufflinks" made by the station's crew, to the damaged solar wing.

The spacewalk is the fourth since the shuttle arrived October 25. Three days after their arrival, spacewalker Daniel Tani found metal shavings inside a joint that rotates wings on the opposite side of the station during a spacewalk, as reported by ANN.

NASA determined repair to that joint was less urgent than the solar wing repair.

Now that the solar wing is repaired the shuttle’s crew will prepare to leave the station. They will close the hatch between the shuttle and the station at 1343 EST on Sunday, after interviews with European media, off-duty time, and farewells.

Discovery is scheduled to undock from the station Monday morning.

(Images courtesy of NASA TV)

FMI: www.nasa.gov, http://spaceflight.nasa.gov/station/

Advertisement

More News

USCG MH-60 To The Rescue (Again) -- Rescues 4 Boaters

Capsized Vessel Located Near Dauphin Island, Alabama The Coast Guard rescued four boaters after their vessel capsized near Dauphin Island, Alabama, Thursday. Coast Guard District E>[...]

Gray Eagle Order Placed for Army National Guard

Reserve Components Looking to Improve In-House General Atomics Aeronautical Systems announced a fresh order for a dozen Gray Eagle 25M UAVs with accompanying equipment, for fulfill>[...]

Aero-Biz Survival 101 (1120a): Expert Ideas To Help You Through Tough Times

Brand New! Avoid The Need For A Comeback... Get Your Marketing Right, Right Now! Some time ago, the Aero-News Network, responding to numerous requests, established a marketing and >[...]

Airborne 06.03.24: Rotax 915/916 SB, Starship 4 Ready?, B-17 Mementos

Also: Hubble On Pause, FedEx Pilots Picket, Nexus eVTOL, VFS Honors The Rotax folks have published a Service Bulletin after issues were noted that may affect all R915i and R916i se>[...]

Mid-Continent Instruments and Avionics Mourns Former Leader

John W. Winter of AEA and Avionic Fame Passes John W. Winter brought Mid-Continent Instrument Company into the modern era in 1980, purchasing the firm and using it as a base for ex>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC