MQ-8C Fire Scout Completes Operational Assessment | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-Unlimited-04.23.24

Airborne-Unlimited-04.24.24 Airborne-FltTraining-04.25.24

Airborne-Unlimited-04.26.24

Sat, Dec 05, 2015

MQ-8C Fire Scout Completes Operational Assessment

Completed Assessment Period Last Month At Point Magu Naval Base

The MQ-8C Fire Scout completed a three week operational assessment period Nov. 20 at Naval Base Ventura County at Point Mugu, California.

The OA included 11 flights totaling 83.4 flight hours where Fire Scout was tested against maritime and surveyed land targets to assess system performance, endurance and reliability of the unmanned helicopter.

“MQ-8C is meeting or exceeding its performance objectives and will deliver greater warfighting capabilities to the fleet in the future,” said Capt Jeff Dodge , Fire Scout’s program manager for Multi-Mission Tactical Unmanned Aerial Systems.

The MQ-8C will provide twice the endurance and three times the payload as the existing MQ-8B.  It has a range of 150 nautical miles and a payload capacity of more than 700 pounds which provides unique situational awareness and precision target support for the Navy on land and at-sea with its multiple intelligence, surveillance and reconnaissance (ISR) capabilities.

The smaller MQ-8B, currently deployed on the USS Fort Worth (LCS-3), has flown more than 16,000 hours and demonstrated the ability to operate alongside the MH-60 manned helicopter during ship-based operations.

“The C model will greatly impact how we monitor, understand and control the sea and air space around small surface combatants,” Dodge said.

The MQ-8C has logged 427 flights and more than 730 flight hours to date.  Initial ship-based testing is scheduled to begin in fiscal year 2017.

(Image provided with NAVAIR news release)

FMI: www.navair.navy.mil

Advertisement

More News

ANN's Daily Aero-Term (04.28.24): Airport Marking Aids

Airport Marking Aids Markings used on runway and taxiway surfaces to identify a specific runway, a runway threshold, a centerline, a hold line, etc. A runway should be marked in ac>[...]

Aero-News: Quote of the Day (04.28.24)

"It is extremely difficult, if not impossible, for manned aircraft to see a drone while conducting crop-enhancing and other aerial applications at low altitudes and high speeds. We>[...]

ANN's Daily Aero-Linx (04.28.24)

Aero Linx: The Skyhawk Association The Skyhawk Association is a non-profit organization founded by former Skyhawk Pilots which is open to anyone with an affinity for the A-4 Skyhaw>[...]

Aero-News: Quote of the Day (04.29.24)

“The T-54A benefits from an active Beechcraft King Air assembly line in Wichita, Kansas, where all required METS avionics and interior modifications are installed on the line>[...]

ANN's Daily Aero-Linx (04.29.24)

Aero Linx: Aerostar Owners Association The Association offers the Aerostar Owner a unique opportunity to tap an invaluable source of information concerning the care and feeding of >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC