Navy Launches New Sustainment Pilot Program For E-2D | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Mon, Jan 13, 2020

Navy Launches New Sustainment Pilot Program For E-2D

SPB Identifies And Governs Complex Interdependencies And Refines Resource Allocation Risks

Achieving and maintaining predictable and affordable Readiness across the Fleet requires a disciplined performance driven Sustainment process. Department of Navy (DoN) leaders took a bold step in establishing an enduring and disciplined Sustainment management process by approving and launching the first Sustainment Program Baseline (SPB) pilot for the E-2D Advanced Hawkeye in fiscal 2020.

While the Navy achieved the Secretary of Defense’s mission capable Hornet aircraft rate at the end of fiscal 2019, maintaining those readiness levels remains at the forefront. To do this, the DoN is seeking to improve the sustainment of weapon systems such as the E-2D Advanced Hawkeye, through a rigorous and disciplined process with improved requirements, funding, and performance controls and governance – the sustainment program baseline.

“We are implementing new processes to bring more rigor into our sustainment efforts, and therefore increasing our output to the fleet,” said Sean Burke, Deputy Assistant Secretary of the Navy (Sustainment). “This sustainment pilot will improve the accuracy of our requirements, funding, performance, and governance of weapon system sustainment.”

Sustainment is the management of everything required to enable future Readiness; it reaches back through the enterprise from the flightline, across multiple organizations and disciplines, and consumes more than half of the Navy’s budget. To maintain mission capable rates across the Fleet, a highly complex naval sustainment ‘system of systems’ must manage tens of thousands of parts from thousands of suppliers, truckloads of ever-changing technical data, millions of software lines of code, and billions in funding must be aligned, finely tuned and actively managed.

A key component of the pilot process is specific performance requirements for supply, repair, support equipment, engineering, trainers, maintenance and technical data unique for the E-2D that enable Fleet squadrons to achieve Readiness. The SPB identifies and governs complex interdependencies and refines resource allocation risks across the Sustainment system.

Capt. Keith Hash, E-2/C-2 Airborne Command and Control Systems program manager, and Capt. Matthew Duffy, E-2 Wing Commander, have worked closely together to address readiness issues. The E-2D SPB takes their partnership to a new level, with a weapon system focused sustainment document submitted by the Fleet commander and the Program Manager.

“We welcome the SPB and its processes of setting specific comprehensive requirements and regularly measuring performance across the span of product support providers,” Duffy said. “This will ultimately generate more readiness and provide additional [full mission capable] Advanced Hawkeyes ready for the high end fight.”

Traditionally, the Fleet has reported mission capability, but under SPB, Duffy and Hash will also report quarterly on the performance of the Sustainment system to their approved requirements directly to the Vice Chief of Naval Operations (VCNO), Assistant Secretary Of The Navy Research, Development & Acquisition (ASN(RD&A)), and Commander, Naval Air Forces (CNAF).

(Images provided with NAVAIR news release)

FMI: www.navair.navy.mil

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC