First Soyuz Almost Ready For Launch From French Guiana | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-10.28.24

Airborne-NextGen-10.29.24

Airborne-Unlimited-10.30.24

Airborne-Unlimited-10.24.24

Airborne-Unlimited-10.25.24

Fri, May 06, 2011

First Soyuz Almost Ready For Launch From French Guiana

Dry Runs Underway To Test Facilities

The final countdown before its maiden flight later this year has begun for Soyuz with a simulated launch campaign at Europe's Spaceport in French Guiana. This dry run ensures that the Soyuz and the new facilities work together perfectly, while allowing the teams to train under realistic launch conditions. It also validates all the procedures during the final phase before launch, except the fuelling of the vehicle.

Last Friday, one of the two Soyuz launchers already at the Spaceport was rolled out of the preparation building horizontally using the 600 m-long railway leading to the launch platform. The vehicle was then erected into the vertical position and suspended over the pad with the use of four support arms. The mobile gantry, built specifically for Soyuz operations in French Guiana, was rolled out to the pad and the vehicle's upper composite, comprising the Fregat upper stage and payload fairing, was hoisted on top of the launcher.

The rehearsal is simulating the five-day final phase before launch. The final countdown will be performed, including the gantry's rollback to its parked position, about 250 feet from the pad. It will be intentionally stopped to validate the procedures in the event of a launch interruption.

The countdown resumed Thursday with a simulated liftoff and flight downrange. These tests will give the green light for the first Soyuz flight from French Guiana in the third quarter of 2011.

FMI: www.arianespace.com

Advertisement

More News

Senator Pushes FAA to Accelerate Rocket Launch Licensing

States That Current Process is Damaging National Aerospace Development US Senator Jerry Morgan is pushing the FAA to speed up the process for rocket launch licensing. He argues tha>[...]

Classic Aero-TV: RJ Gritter - Part of Aviation’s Bright New Future

From 2015 (YouTube Edition): Model Aviator Aims For Full-Scale Career While at the 2015 Indoor Electric RC Festival, referred to as eFest, ANN CEO and Editor-In-Chief, Jim Campbell>[...]

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

ANN's Daily Aero-Linx (10.27.24)

Aero Linx: Cardinal Flyers Online The Cardinal Flyers Online Web site was created and is maintained by me, Keith Peterson. My wife Debbie and I have owned a 1976 RG since 1985. Wit>[...]

ANN's Daily Aero-Term (10.27.24): Clearance Void If Not Off By (Time)

Clearance Void If Not Off By (Time) Used by ATC to advise an aircraft that the departure release is automatically canceled if takeoff is not made prior to a specified time. The exp>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC