Boeing Responds to House T&I Investigation Of 737 MAX | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-07.07.25

Airborne-NextGen-07.08.25

AirborneUnlimited-07.09.25

Airborne-FlightTraining-07.10.25

AirborneUnlimited-07.11.25

Thu, Sep 17, 2020

Boeing Responds to House T&I Investigation Of 737 MAX

"We Have Learned Many Hard Lessons As A Company From The Accidents..."

Boeing cooperated fully and extensively with the Committee’s inquiry since it began in early 2019. We have been hard at work strengthening our safety culture and rebuilding trust with our customers, regulators, and the flying public. The passengers and crew on board Lion Air Flight 610 and Ethiopian Airlines Flight 302, as well as their loved ones, continue to be in our thoughts and prayers.

Multiple committees, experts, and governmental authorities have examined issues related to the MAX, and we have incorporated many of their recommendations, as well as the results of our own internal reviews, into the 737 MAX and the overall airplane design process. The revised design of the MAX has received intensive internal and regulatory review, including more than 375,000 engineering and test hours and 1,300 test flights. Once the FAA and other regulators have determined the MAX can safely return to service, it will be one of the most thoroughly scrutinized aircraft in history, and we have full confidence in its safety. We have also taken steps to bolster safety across our company, consulting outside experts and learning from best practices in other industries. We have set up a new safety organization to enhance and standardize safety practices, restructured our engineering organization to give engineers a stronger voice and a more direct line to share concerns with top management, created a permanent Aerospace Safety Committee of our Board of Directors as well as expanded the role of the Safety Promotion Center.

We have learned many hard lessons as a company from the accidents of Lion Air Flight 610 and Ethiopian Airlines Flight 302, and from the mistakes we have made.  As this report recognizes, we have made fundamental changes to our company as a result, and continue to look for ways to improve. Change is always hard and requires daily commitment, but we as a company are dedicated to doing the work.

FMI: www.boeing.com

Advertisement

More News

Aero-News: Quote of the Day (07.11.25)

“Honored to accept this mission. Time to take over space. Let’s launch.” Source: SecTrans Sean Duffy commenting after President Donald Trump appointed U.S. Secret>[...]

ANN's Daily Aero-Term (07.11.25): Permanent Echo

Permanent Echo Radar signals reflected from fixed objects on the earth's surface; e.g., buildings, towers, terrain. Permanent echoes are distinguished from “ground clutter&rd>[...]

ANN's Daily Aero-Linx (07.11.25)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

NTSB Final Report: Schweizer SGS 2-33A

Glider Encountered A Loss Of Lift And There Was Not Sufficient Altitude To Reach The Airport Analysis: The flight instructor reported that while turning final, the glider encounter>[...]

NTSB Prelim: Aeronca 7AC

Airplane Climbed To 100 Ft Above Ground Level, At Which Time The Airplane Experienced A Total Loss Of Engine Power On May 24, 2025, at 1300 eastern daylight time, an Aeronca 7AC, N>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC