AD: Airbus SAS Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.14.24

Airborne-Unlimited-05.15.24 Airborne-AffordableFlyers-05.16.24

Airborne-Unlimited-05.17.24

Thu, Oct 10, 2019

AD: Airbus SAS Airplanes

AD NUMBER: 2019-19-16

PRODUCT: Certain Airbus SAS Model A320-251N and -271N airplanes, and Model A321-253N airplanes.

ACTION: Final Rule.

SUMMARY: The FAA is superseding Airworthiness Directive (AD) 2019-05-09, which applied to the aircraft listed above.

AD 2019-05-09 required repetitive detailed inspections of certain electrical harnesses for discrepancies, and corrective actions if necessary. AD 2019-05-09 also provided an optional terminating modification for the repetitive detailed inspections.

This AD retains the actions of AD 2019-05-09, and adds a requirement for a terminating modification for the repetitive detailed inspections, as specified in a European Aviation Safety Agency (EASA) AD, which is incorporated by reference. This AD was prompted by reports of low clearance between the electrical harness and nearby hydraulic pipes in the inboard trailing edge of the wing.

DATES: This AD is effective November 13, 2019.

COST: The FAA estimates that this AD affects 14 airplanes of U.S. registry. Operators may incur the following costs in order to comply with this AD:

  • Retained actions from AD 2019-05-09: Labor: 6 work-hours × $85 per hour = $510 per airplane
  • New proposed actions: Labor: 16 work-hours × $85 per hour = $1,360 per airplane. Parts: $8,900, Total cost per airplane: $10,260.

Estimated Costs of On-Condition Actions:

  • Labor: Up to 8 work-hours × $85 per hour = $680 per airplane.
  • The FAA has received no definitive data that would enable the agency to provide parts cost estimates.
FMI: AD

Advertisement

More News

ANN's Daily Aero-Term (05.16.24): Instrument Runway

Instrument Runway A runway equipped with electronic and visual navigation aids for which a precision or nonprecision approach procedure having straight-in landing minimums has been>[...]

ANN's Daily Aero-Linx (05.16.24)

Aero Linx: Alaska Airmen's Association The Alaska Airmen's Association includes over 2,000 members—we are one of the largest General Aviation communities in the country. We s>[...]

Airborne 05.15.24: Ghost Sq MidAir, B-2 Junked, Dream Chaser Readies

Also: Flt School Security, G600 Steep-Approach, Honduran Aid, PW545D Cert Two aircraft performing at the Fort Lauderdale Air Show clipped wings during a routine last Sunday, spooki>[...]

Airborne 05.10.24: Icon Auction, Drunk MedEvac Pilot, Bell ALFA

Also: SkyReach Parts Support, Piper Service Ctr, Airliner Near-Miss, Airshow London The Judge overseeing Icon's convoluted Chapter 11 process has approved $9 million in Chapter 11 >[...]

Airborne Affordable Flyers 05.16.24: PRA Runway, Wag-Aero Sold, Young Eagles

Also: Paramotor Champ's, Electric Ultralight, ICON BK Update, Burt Rutan at Oshkosh! The Popular Rotorcraft Association is reaching out for help in rebuilding their private runway >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC