FAA Warns Of MET Tower Hazards | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Thu, May 13, 2010

FAA Warns Of MET Tower Hazards

Often Uncharted, Difficult To See

The FAA Safety Team (FAAST) has published an advisory about the hazards of MET (Meteorological) Towers that are often erected quickly and can be in place for months or years. The towers are put up to help gather meteorological information before the construction of a wind farm or other alternative energy project.

Towers generally range in height from 30, 50, 60 and 80 meters tall. Any tower less than 200 feet in height is not required by regulation to be lighted. At this time there is no standardized notification system in place to indicate when and where these towers are erected.

These are not posted in any Airport Facility Directory, NOTAMS, etc. unless they interfere with airport operations.


MET Tower FAA Photo

According to the FAA, a sponsor proposing any type of construction or alteration of a structure that may affect the National Airspace System (NAS) is required, under the provisions of Title 14 Code of Federal Regulations (14 CFR part 77, Objects Affecting Navigable Airspace), to notify the FAA by completing the Notice of Proposed Construction or Alteration form.

Generally, any structure that exceeds an overall height of 200 feet above ground level (AGL) or exceeds any obstruction standard contained in 14 CFR part 77 should be marked and/or lighted. Because of the lighting requirement, most METs are just under 200 feet AGL. However, even if the tower is under 200 feet AGL, or meets 14 CFR part 77 standards, the FAA may still recommend marking and/or lighting because of its particular location.


Wind Farm Dept. of Interior Photo

The wind turbines that follow the MET towers can also be difficult to see. An inter-agency memo issued by the Department of the Interior and the Forest Service on low-level flight operations says that wind turbine generators are usually painted white because it’s the most effective daytime early warning device. Other colors, such as light gray or blue, appear to be significantly less effective in providing daytime warning. Daytime lighting of wind turbines, regardless of height, is not required, as long as the structures are painted in a bright white color or light off-white color.

FMI: www.faa.gov

Advertisement

More News

ANN's Daily Aero-Term (04.24.24): Runway Lead-in Light System

Runway Lead-in Light System Runway Lead-in Light System Consists of one or more series of flashing lights installed at or near ground level that provides positive visual guidance a>[...]

ANN's Daily Aero-Linx (04.24.24)

Aero Linx: Aviation Without Borders Aviation Without Borders uses its aviation expertise, contacts and partnerships to enable support for children and their families – at hom>[...]

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

Classic Aero-TV: Best Seat in The House -- 'Inside' The AeroShell Aerobatic Team

From 2010 (YouTube Version): Yeah.... This IS A Really Cool Job When ANN's Nathan Cremisino took over the lead of our Aero-TV teams, he knew he was in for some extra work and a lot>[...]

Airborne Affordable Flyers 04.18.24: CarbonCub UL, Fisher, Affordable Flyer Expo

Also: Junkers A50 Heritage, Montaer Grows, Dynon-Advance Flight Systems, Vans' Latest Officially, the Carbon Cub UL and Rotax 916 iS is now in its 'market survey development phase'>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC