NTSB Issues Seventh Update On JAL Boeing 787 Battery Fire Investigation | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.20.24

Airborne-NextGen-05.21.24

Airborne-Unlimited-05.15.24 Airborne-AffordableFlyers-05.16.24

Airborne-Unlimited-05.17.24

Sat, Feb 02, 2013

NTSB Issues Seventh Update On JAL Boeing 787 Battery Fire Investigation

No Anomalies Detected After Multiple Examinations

The NTSB on Friday released the seventh update on its investigation into the Jan. 7 fire aboard a Japan Airlines Boeing 787 at Logan International Airport in Boston.

The auxiliary power unit battery, manufactured by GS Yuasa, was the original battery delivered with the airplane on December 20, 2012. It is comprised of eight individual cells. All eight cells came from the same manufacturing lot in July 2012. The battery was assembled in September 2012 and installed on the aircraft on October 15, 2012. It was first charged on October 19, 2012.

Examination and testing of an exemplar battery got underway earlier this week at the Carderock Division of the Naval Surface Warfare Center laboratories in West Bethesda, MD. The tests consisted of electrical measurements, mass measurements, and infrared thermal imaging of each cell, with no anomalies noted. The cells are currently undergoing CT scanning to examine their internal condition. In addition, on Thursday, a battery expert from the Department of Energy joined the investigative team to lend his expertise to the ongoing testing and validation work.

FMI: www.ntsb.gov

Advertisement

More News

Samson Sky Hits the Wind Tunnel

Improvements Stack as Brand Readies for Mass Production Samson Sky updated followers on its flying car progress, describing some of the travails of the wind tunnel as they get clos>[...]

ANN's Daily Aero-Term (05.22.24): LAHSO

LAHSO An acronym for “Land and Hold Short Operation.” These operations include landing and holding short of an intersecting runway, a taxiway, a predetermined point, or>[...]

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

ANN's Daily Aero-Linx (05.19.24)

Aero Linx: Space Medicine Association (SMA) The Space Medicine Branch was founded in 1951 as the first constituent organization of the Aerospace Medical Association (AsMA). In 2006>[...]

ANN's Daily Aero-Term (05.19.24): Back-Taxi

Back-Taxi A term used by air traffic controllers to taxi an aircraft on the runway opposite to the traffic flow. The aircraft may be instructed to back-taxi to the beginning of the>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC