Successful First Flight For UAE's Initial PC-21 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Sun, Nov 28, 2010

Successful First Flight For UAE's Initial PC-21

Pilatus Delivers Military Trainer One Year After Signing The Contract

The initial flight of the first Pilatus PC-21 for the United Arab Emirates (UAE) Air Force & Air Defence took place Monday, one year to the day after the contract was signed.


Pilatus PC-21

Prior to first flight, the aircraft was rolled out and presented to the UAE Air Force & Air Defence by Oscar Schwenk, Chairman & CEO of Pilatus Aircraft Limited, in a ceremony attended by members of the Pilatus executive management and project teams from both parties.

After the roll-out, the aircraft's first flight was a ferry flight to the Buochs airfield. Pilatus' chief test pilot departed at 1034 local time on a flight which served as the final check for quality control and conformity. After engine checks on the runway, aircraft was taken to 10,000 feet, where an engine shut down and restart sequence is performed to prove the functionality of the engine related systems. Next, various mechanical systems are checked, including flight controls systems, airframe stall characteristics, engine performance and inverted flight. Finally the landing gear functionality was tested, the data was examined, and the aircraft prepped for the remaining production flight test.


Pilatus PC-21 Cockpit

A post flight debriefing was undertaken with the UAE Air Force & Air Defence, represented by Brigadier General Sami Saeed Al Nuaimi, and this formally closes this element of the project.

Delivery of the 25 PC-21 aircraft and the other key components of the Pilatus training system are scheduled to commence in the first quarter
2011.

FMI: www.pilatus.com

Advertisement

More News

ANN's Daily Aero-Term (04.24.24): Runway Lead-in Light System

Runway Lead-in Light System Runway Lead-in Light System Consists of one or more series of flashing lights installed at or near ground level that provides positive visual guidance a>[...]

ANN's Daily Aero-Linx (04.24.24)

Aero Linx: Aviation Without Borders Aviation Without Borders uses its aviation expertise, contacts and partnerships to enable support for children and their families – at hom>[...]

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

Classic Aero-TV: Best Seat in The House -- 'Inside' The AeroShell Aerobatic Team

From 2010 (YouTube Version): Yeah.... This IS A Really Cool Job When ANN's Nathan Cremisino took over the lead of our Aero-TV teams, he knew he was in for some extra work and a lot>[...]

Airborne Affordable Flyers 04.18.24: CarbonCub UL, Fisher, Affordable Flyer Expo

Also: Junkers A50 Heritage, Montaer Grows, Dynon-Advance Flight Systems, Vans' Latest Officially, the Carbon Cub UL and Rotax 916 iS is now in its 'market survey development phase'>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC