AD: Airbus Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Mon, Aug 12, 2013

AD: Airbus Airplanes

AD NUMBER: 2013-16-09

PRODUCT: All Airbus Model A318, A319, A320, and A321 series airplanes.
SUBJECT: Airworthiness Directive 2013-16-09
ACTION: Final rule; request for comments.

SUMMARY:  This AD requires an inspection to determine airplane configuration and part numbers of the landing gear control interface unit and main landing gear (MLG) door actuators; and, for affected airplanes, repetitive inspections of the opening sequence of the MLG door actuator, and replacement of the MLG door actuator if necessary.

This AD also provides optional terminating action for the repetitive inspections. This AD was prompted by a report of a MLG failing to extend during landing, and a determination that a certain configuration of landing gear control interface unit and actuators may result in masking of centralized fault display system messages that are necessary to mitigate risks associated with failure of MLG extension or downlocking.

The FAA is issuing this AD to detect and correct such a configuration, which could prevent the full extension or down-locking of the MLG, possibly resulting in MLG collapse during landing and consequent damage to the airplane and injury to occupants.

DATES: This AD becomes effective August 23, 2013. Comments on this AD must be received by September 23, 2013.

FMI: AD

Advertisement

More News

Airborne 05.10.24: Icon Auction, Drunk MedEvac Pilot, Bell ALFA

Also: SkyReach Parts Support, Piper Service Ctr, Airliner Near-Miss, Airshow London The Judge overseeing Icon's convoluted Chapter 11 process has approved $9 million in Chapter 11 >[...]

ANN's Daily Aero-Term (05.13.24): ILS PRM Approach

ILS PRM Approach An instrument landing system (ILS) approach conducted to parallel runways whose extended centerlines are separated by less than 4,300 feet and at least 3,000 feet >[...]

ANN's Daily Aero-Linx (05.13.24)

Aero Linx: FlyPups FlyPups transports dogs from desperate situations to fosters, no-kill shelters, and fur-ever homes. We deliver trained dogs to veterans for service and companion>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Airborne 05.08.24: Denali Update, Dad-Daughter Gyro, Lake SAIB

Also: NBAA on FAA Reauth, DJI AG Drones, HI Insurance Bill Defeated, SPSA Airtankers The Beechcraft Denali continues moving forward towards certification, having received its FAA T>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC