Successful Brimstone Weapon Integration Flight Trials Continue For Typhoon | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Thu, Mar 16, 2017

Successful Brimstone Weapon Integration Flight Trials Continue For Typhoon

Testing Conducted At BAE Systems' Site In Warton, Lancashire

A further series of flight trials of Eurofighter Typhoon with the low-collateral, high precision MBDA Brimstone air-to-surface weapon have been successfully completed at BAE Systems’ site in Warton, Lancashire.

The trials are part of ongoing development work on the Phase 3 Enhancement (P3E) package for Typhoon, which will also deliver further sensor and mission system upgrades as part of Project CENTURION  – the programme to ensure a smooth transition of Tornado capabilities to Typhoon for the Royal Air Force by the end of 2018.

The trials were conducted using the UK Typhoon Instrumented Production Aircraft (IPA) 6, and formed part of work to gather air data on the weapon and expand the carriage envelope. Firing trials are now scheduled for later this year to test the effectiveness of the weapon in operational scenarios.

The flight trials, an important milestone on the integration programme following the completion of ground testing and initial flight trials last year, were partly carried out through a Combined Testing Team (CTT) approach with pilots from the Royal Air Force’s 41(R) Squadron (the RAF’s Test and Evaluation Squadron). In total around 40 trials to integrate Brimstone with Typhoon have seen the aircraft flown with four AMRAAM, two ASRAAM, two Paveway IV laser guided/GPS bombs and two launchers each containing three Brimstone missiles. Eight of the 40 flights have been carried out with 41(R) Squadron.

Steve Formoso, Chief Test Pilot for BAE Systems Military Air & Information business, said “This series of flight trials has included Aero Data Gathering (ADG) flights to test how the addition of the Brimstone weapon and other assets interacts with the aircraft’s flight control system software. The results have been excellent, with the pilot maintaining manoeuvrability whilst carrying a heavy weapons load.

“The detailed results of these trials will now be analysed and further testing carried out ahead of firing trials. The low-collateral Brimstone will provide the Typhoon pilot with the ability to precisely attack fast-moving targets at range, further enhancing the aircraft’s already potent air-to-surface capabilities.”

"This continues to be an incredibly productive time for Typhoon development and the benefits of the Combined Testing Team approach are clearly visible," said James McLaughlin, BAE Systems’ Contract Delivery Manager for Typhoon Phase 3 Enhancements. "The dedicated work of our teams and partner companies has ensured we have been able to conduct a large number of flight trials in a short space of time, involve the Royal Air Force within the process and reach an important milestone on the Brimstone integration program.”

The flight trials program for Brimstone is running alongside ongoing Typhoon development programmes with the Meteor and Storm Shadow weapons, which form part of the aircraft’s Phase 2 Enhancement (P2E) package due to be delivered into service in 2018.

The CTT approach is designed to allow 41(R) Squadron to participate in early versions of planned upgrades, providing feedback that can be assessed and directly worked back into the design process, ensuring an end product which meets Royal Air Force requirements.

(Image provided with BAE Systems news release)

FMI: www.baesystems.com

Advertisement

More News

ANN's Daily Aero-Term (04.24.24): Runway Lead-in Light System

Runway Lead-in Light System Runway Lead-in Light System Consists of one or more series of flashing lights installed at or near ground level that provides positive visual guidance a>[...]

ANN's Daily Aero-Linx (04.24.24)

Aero Linx: Aviation Without Borders Aviation Without Borders uses its aviation expertise, contacts and partnerships to enable support for children and their families – at hom>[...]

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

Classic Aero-TV: Best Seat in The House -- 'Inside' The AeroShell Aerobatic Team

From 2010 (YouTube Version): Yeah.... This IS A Really Cool Job When ANN's Nathan Cremisino took over the lead of our Aero-TV teams, he knew he was in for some extra work and a lot>[...]

Airborne Affordable Flyers 04.18.24: CarbonCub UL, Fisher, Affordable Flyer Expo

Also: Junkers A50 Heritage, Montaer Grows, Dynon-Advance Flight Systems, Vans' Latest Officially, the Carbon Cub UL and Rotax 916 iS is now in its 'market survey development phase'>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC