Boeing Delivers 7th Production P-8A Poseidon Aircraft To US Navy | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-10.28.24

Airborne-NextGen-10.29.24

Airborne-Unlimited-10.30.24

Airborne-Unlimited-10.24.24

Airborne-Unlimited-10.25.24

Wed, Apr 03, 2013

Boeing Delivers 7th Production P-8A Poseidon Aircraft To US Navy

First Aircraft Produced Under Second Low-Rate Initial Production Contract

The seventh production P-8A Poseidon was handed over to the U.S. Navy by Boeing on March 29,marking the first delivery from the second low-rate initial production contract awarded in November 2011. The maritime patrol aircraft departed Boeing Field in Seattle for Naval Air Station Jacksonville, FL, where it joined six P-8As currently being used to train Navy crews.

"This is our second P-8A delivery of 2013, and we'll continue to provide the Navy with new Poseidon aircraft at a rate of nearly one a month," said Rick Heerdt, Boeing vice president and P-8 program manager. "We've got a full factory of P-8As for the U.S. Navy and P-8I aircraft for India, and we're working side-by-side with both customers to introduce the aircraft's advanced capabilities into their fleets."

Boeing is on contract to build and support 24 P-8A aircraft as part of three LRIP contracts awarded in 2011 and 2012. The Navy plans to purchase 117 P-8As, which are based on the Next-Generation Boeing 737-800 platform. The versatile multi-mission aircraft provides broad long-range maritime patrol capabilities -- anti-submarine warfare, anti-surface warfare, intelligence, surveillance and reconnaissance -- and will replace the Navy P-3 fleet.

(Image provided by Boeing)

FMI: www.boeing.com, www.navy.mil

Advertisement

More News

Senator Pushes FAA to Accelerate Rocket Launch Licensing

States That Current Process is Damaging National Aerospace Development US Senator Jerry Morgan is pushing the FAA to speed up the process for rocket launch licensing. He argues tha>[...]

Classic Aero-TV: RJ Gritter - Part of Aviation’s Bright New Future

From 2015 (YouTube Edition): Model Aviator Aims For Full-Scale Career While at the 2015 Indoor Electric RC Festival, referred to as eFest, ANN CEO and Editor-In-Chief, Jim Campbell>[...]

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

ANN's Daily Aero-Linx (10.27.24)

Aero Linx: Cardinal Flyers Online The Cardinal Flyers Online Web site was created and is maintained by me, Keith Peterson. My wife Debbie and I have owned a 1976 RG since 1985. Wit>[...]

ANN's Daily Aero-Term (10.27.24): Clearance Void If Not Off By (Time)

Clearance Void If Not Off By (Time) Used by ATC to advise an aircraft that the departure release is automatically canceled if takeoff is not made prior to a specified time. The exp>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC