AD: The Boeing Company Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Thu, Jan 04, 2018

AD: The Boeing Company Airplanes

AD NUMBER: 2017-26-10

PRODUCT: Certain Boeing Model 757 airplanes

ACTION: Final rule; request for comments.

SUMMARY: The FAA is superseding Airworthiness Directive (AD) 2015-08-01, which applied to the aircraft listed above.

AD 2015-08-01 required, depending on airplane configuration, installing new relays and bracket assemblies, inspecting to ensure that the new relays do not contact adjacent wire bundles, torqueing the bracket assembly installation nuts and ground stud nuts, retesting the bond resistance between the bracket assemblies and the terminal lugs on the ground studs, and doing related investigative and corrective actions if necessary.

This AD does not retain any requirements, and instead requires deactivating the spoiler control module relays and capping and stowing the associated wiring on airplanes on which the actions required by AD 2015- 08-01 have been done.

This AD was prompted by a report of an uncommanded spoiler movement during flap configuration just before landing, on an airplane on which the actions required by AD 2015-08-01 had been done.

COST: The FAA estimates the cost of compliance with this AD to be $2,570 for parts and labor.

DATES: This AD is effective January 3, 2018. Comments must be received by February 12, 2018.

FMI: AD

Advertisement

More News

Airborne 05.10.24: Icon Auction, Drunk MedEvac Pilot, Bell ALFA

Also: SkyReach Parts Support, Piper Service Ctr, Airliner Near-Miss, Airshow London The Judge overseeing Icon's convoluted Chapter 11 process has approved $9 million in Chapter 11 >[...]

ANN's Daily Aero-Term (05.13.24): ILS PRM Approach

ILS PRM Approach An instrument landing system (ILS) approach conducted to parallel runways whose extended centerlines are separated by less than 4,300 feet and at least 3,000 feet >[...]

ANN's Daily Aero-Linx (05.13.24)

Aero Linx: FlyPups FlyPups transports dogs from desperate situations to fosters, no-kill shelters, and fur-ever homes. We deliver trained dogs to veterans for service and companion>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Airborne 05.08.24: Denali Update, Dad-Daughter Gyro, Lake SAIB

Also: NBAA on FAA Reauth, DJI AG Drones, HI Insurance Bill Defeated, SPSA Airtankers The Beechcraft Denali continues moving forward towards certification, having received its FAA T>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC