FAA Approves Southwest Airlines Plan To Replace Unapproved Parts | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Wed, Sep 02, 2009

FAA Approves Southwest Airlines Plan To Replace Unapproved Parts

All Parts Must Be Replaced By December 24th, Aircraft Deemed Safe To Fly

The FAA Tuesday approved a plan that would require Southwest Airlines to replace unapproved parts installed on about 50 B737 airplanes and for these aircraft to undergo inspections until fixes are made. The airline already has replaced parts on 30 other planes.

An FAA technical review has determined that the unapproved part would not prevent safe operation of the airplanes. The aircraft manufacturer has made a similar determination. As a result, the FAA has determined that the airline may continue to operate aircraft with the unapproved part until the parts can be replaced, on the condition that each plane must be physically inspected for wear and tear every seven days and the affected parts must all be replaced with an approved part by December 24.

The FAA has also directed Southwest Airlines to locate and dispose of any other unapproved parts made by the same vendor and to report on the results of its aircraft inspections to the FAA on a daily basis.
 
The unapproved parts are associated with the hinge fittings for the exhaust gate assembly, which help protect the aircraft flaps from engine heat. The FAA determined on August 21 that the parts had been installed on a number of Southwest Airlines planes. The FAA has opened an investigation into this issue.

FMI: www.faa.gov

Advertisement

More News

Sierra Space Repositions Dream Chaser for First Mission

With Testing Soon Complete, Launch Preparations Begin in Earnest Sierra Space's Dream Chaser has been put through the wringer at NASA's Glenn Armstrong Test Facility in Ohio, but w>[...]

ANN's Daily Aero-Term (05.10.24): Takeoff Roll

Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]

Aero-News: Quote of the Day (05.10.24)

“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]

Aero-News: Quote of the Day (05.11.24)

"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]

ANN's Daily Aero-Term (05.11.24): IDENT Feature

IDENT Feature The special feature in the Air Traffic Control Radar Beacon System (ATCRBS) equipment. It is used to immediately distinguish one displayed beacon target from other be>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC