New Date Set For Full-Scale NASA/ATK Ares I Solid Rocket Motor Test | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-10.28.24

Airborne-NextGen-10.29.24

Airborne-Unlimited-10.30.24

Airborne-Unlimited-10.24.24

Airborne-Unlimited-10.25.24

Mon, Sep 07, 2009

New Date Set For Full-Scale NASA/ATK Ares I Solid Rocket Motor Test

First Ground Test of the Ares I Five-Segment Solid Rocket Motor Re-Sked

Alliant Techsystems Space Systems and NASA have finally identified the issue that resulted in the scrub of last week's test of the Ares 1 solid rocket motor system. A component of the ground controller unit, which sends power to the system that moves the nozzle during the test, failed and has been replaced.

The test has been rescheduled for Thursday, Sept. 10. Final testing of the ground system has continued over the weekend and early next week. The current schedule calls for the test to go off at 1300 MDT, at the ATK Space Systems facility in Promontory, Utah.

Test Objectives:

  • A total of 46 design objectives will be measured through 650 instrument channels
  • The Ares I design is based on the design of the space shuttle's four-segment booster
  • The addition of the fifth segment will increase the maximum thrust performance to approximately 3.6 million pounds
  • The first stage of Ares I has been under development since 2005. It measures 12 feet in diameter and 154 feet in length
  • The cases have all previously flown on the space shuttle, collectively launching on 48 missions--including STS-1

If you happen to live locally, a public viewing area is available along State Road 83 North approximately 20 miles west of Corinne, Utah.

FMI: www.atk.com

Advertisement

More News

Senator Pushes FAA to Accelerate Rocket Launch Licensing

States That Current Process is Damaging National Aerospace Development US Senator Jerry Morgan is pushing the FAA to speed up the process for rocket launch licensing. He argues tha>[...]

Classic Aero-TV: RJ Gritter - Part of Aviation’s Bright New Future

From 2015 (YouTube Edition): Model Aviator Aims For Full-Scale Career While at the 2015 Indoor Electric RC Festival, referred to as eFest, ANN CEO and Editor-In-Chief, Jim Campbell>[...]

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

ANN's Daily Aero-Linx (10.27.24)

Aero Linx: Cardinal Flyers Online The Cardinal Flyers Online Web site was created and is maintained by me, Keith Peterson. My wife Debbie and I have owned a 1976 RG since 1985. Wit>[...]

ANN's Daily Aero-Term (10.27.24): Clearance Void If Not Off By (Time)

Clearance Void If Not Off By (Time) Used by ATC to advise an aircraft that the departure release is automatically canceled if takeoff is not made prior to a specified time. The exp>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC