Next Ariane 5 Mission Enters Payload Integration Phase | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Fri, Sep 05, 2014

Next Ariane 5 Mission Enters Payload Integration Phase

Heavy-Lift Mission Scheduled For Launch Next Week

Payload integration is underway for Arianespace’s upcoming heavy-lift Ariane 5 mission, which is scheduled for next week from French Guiana with two commercial telecommunications satellites: MEASAT-3b and Optus 10.

Recent activity at the Spaceport included initial steps in creating the dual-payload “stack,” with MEASAT-3b riding in the upper position.  This involved installing the relay platform – manufactured by Airbus Defence and Space – atop Ariane 5’s SYLDA dispenser system in the launcher’s Final Assembly Building.  

MEASAT-3b was then encapsulated by Ariane 5’s ogive-shaped payload fairing, completing the payload stack’s upper portion and readying it for positioning over Optus 10 after this spacecraft is installed atop the launcher.

During the Ariane 5 mission, which is set for the evening of September 11, MEASAT-3b will be released first into geostationary transfer orbit, followed by separation of the SYLDA dispenser – enabling Optus 10’s subsequent deployment.

MEASAT-3b is equipped with 48 high-power Ku-band transponders to expand direct-to-home broadcasting and VSAT (very small aperture terminal) services across Malaysia, India, Indonesia and Australia.

Optus 10, which was built by SSL (Space Systems/Loral) for Australian telecommunications service provider Optus, has been fueled at the Spaceport in the S5 payload preparation facility.  This satellite is outfitted with 24 Ku-band transponders to provide direct TV broadcast, internet connectivity, telephone and data transmission services for Australia and New Zealand.

The Ariane 5 mission with MEASAT-3b and Optus 10 is designated Flight VA218 in Arianespace’s launcher family numbering system. It will be the fourth launch of the heavy-lift workhorse from French Guiana in 2014.

(Image provided by Arianespace)

FMI: www.arianespace.com

Advertisement

More News

ANN's Daily Aero-Term (04.26.24): DETRESFA (Distress Phrase)

DETRESFA (Distress Phrase) The code word used to designate an emergency phase wherein there is reasonable certainty that an aircraft and its occupants are threatened by grave and i>[...]

ANN's Daily Aero-Linx (04.26.24)

Aero Linx: The International Association of Missionary Aviation (IAMA) The International Association of Missionary Aviation (IAMA) is comprised of Mission organizations, flight sch>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne-NextGen 04.23.24: UAVOS UVH 170, magni650 Engine, World eVTOL Directory

Also: Moya Delivery Drone, USMC Drone Pilot, Inversion RAY Reentry Vehicle, RapidFlight UAVOS has recently achieved a significant milestone in public safety and emergency services >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC