New LAX Runway Showing Construction Flaws | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Mon, Oct 21, 2013

New LAX Runway Showing Construction Flaws

Cracks In The Pavement, Other Premature Wear Leads To Lawsuits Against Contractors

A 13,000-foot runway at Los Angeles International Airport (KLAX) which opened in April 2007 is already showing signs of wear, and the city has filed a $250 million lawsuit against four contractors that worked on the resurfacing project.

The suit alleges that construction flaws have led to cracks and other signs of wear in the pavement. The Los Angeles Times reports that, according to court documents, the pavement may need to be replaced again much sooner than would normally be expected, leading to disruptions in operations at the airport.

"As a result of the contractors’ negligent construction, the runway is deteriorating in an accelerated fashion and will ultimately interfere with ongoing runway operations," the lawsuit, filed in  Los Angeles County Superior Court in Torrance, CA states.

Among the defects listed in the suit are early deterioration of the concrete, as well as damaged or lost concrete, mortar lift-off, and "pop-outs" of some sections of the runway.

The contractors named in the lawsuit include R & L Brosamer, HNTB Corp., CH2M Hill Inc. and a joint venture involving Tutor-Saliba Corp. and O & G Industries Inc.

FMI: www.lacity.org

 


Advertisement

More News

Sierra Space Repositions Dream Chaser for First Mission

With Testing Soon Complete, Launch Preparations Begin in Earnest Sierra Space's Dream Chaser has been put through the wringer at NASA's Glenn Armstrong Test Facility in Ohio, but w>[...]

ANN's Daily Aero-Term (05.10.24): Takeoff Roll

Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]

Aero-News: Quote of the Day (05.10.24)

“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]

Aero-News: Quote of the Day (05.11.24)

"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]

ANN's Daily Aero-Term (05.11.24): IDENT Feature

IDENT Feature The special feature in the Air Traffic Control Radar Beacon System (ATCRBS) equipment. It is used to immediately distinguish one displayed beacon target from other be>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC