Patuxent River Welcomes CH-53K To Flight Line | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Fri, Jul 07, 2017

Patuxent River Welcomes CH-53K To Flight Line

First Of Seven Aircraft Expected To Arrive During The Next 12 Months

The first CH-53K King Stallion to touch down at Naval Air Station (NAS) Patuxent River, Maryland arrived June 30. Relocated from Sikorsky's Development Flight Center in West Palm Beach, Florida, it is the first of seven aircraft expected to arrive over the next 12 months.

At NAS Patuxent River, the helicopter will undergo various flight quality, ground and avionics test events. This particular CH-53K is an Engineering Development and Manufacturing Model (EDM), specifically designed to demonstrate the capabilities of the platform throughout the testing process. The helicopter will be operated and maintained by a joint team of Air Test and Evaluation Squadron (HX) 21, NAVAIR and Sikorsky pilots, aircrew, engineers and maintainers.

“With each flight hour logged on this platform, we are one step closer to bringing our nation’s most powerful helicopter to the Marines,” said U.S. Marine Corps Col. Hank Vanderborght, program manager for the Naval Air Systems Command's (NAVAIR) Heavy Lift Helicopters program, PMA-261.

The successful ferry flight follows the Milestone C decision in March, approving the program to proceed with low-rate initial production. CH-53K production is expected to begin Summer 2017, and initial operational capability and initial operational test and evaluation are on pace for 2019.

“This is an exciting moment for the program; transitioning the aircraft to Pax River is the result of thousands of hours of dedicated service by the government and industry teams,” Vanderborght said.

With more than triple the payload capability and a 12-inch wider internal cabin than its predecessor (CH-53E Super Stallion), the CH-53K’s payload capability can take the form of a variety of relevant payloads ranging from an internally loaded High Mobility, Multipurpose Wheeled Vehicle or the European Fennek armored personnel carrier. In addition, it can handle up to three independent external loads at once, which gives mission flexibility and system efficiency.

(Image provided with NAVAIR news release)

FMI: www.navair.navy.mil

Advertisement

More News

Sierra Space Repositions Dream Chaser for First Mission

With Testing Soon Complete, Launch Preparations Begin in Earnest Sierra Space's Dream Chaser has been put through the wringer at NASA's Glenn Armstrong Test Facility in Ohio, but w>[...]

ANN's Daily Aero-Term (05.10.24): Takeoff Roll

Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]

Aero-News: Quote of the Day (05.10.24)

“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]

Aero-News: Quote of the Day (05.11.24)

"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]

ANN's Daily Aero-Term (05.11.24): IDENT Feature

IDENT Feature The special feature in the Air Traffic Control Radar Beacon System (ATCRBS) equipment. It is used to immediately distinguish one displayed beacon target from other be>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC