AD: Dassault Aviation Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.14.24

Airborne-Unlimited-05.15.24 Airborne-AffordableFlyers-05.16.24

Airborne-Unlimited-05.17.24

Wed, Nov 22, 2017

AD: Dassault Aviation Airplanes

AD NUMBER: 2017-23-10

PRODUCT: Certain Dassault Aviation Model FALCON 900EX and FALCON 2000EX airplanes.

ACTION: Final Rule.

SUMMARY: The FAA is superseding Airworthiness Directive (AD) 2017-19-17, which applied to the products listed above.

AD 2017-19-17 required revising the airplane flight manual (AFM) to include procedures to follow when an airplane is operating in icing conditions.

AD 2017-19-17 also required a detailed inspection of the wing antiice system ducting for the presence of a diaphragm, and follow-on actions (replacement of ducting or re-identification of the ducting part marking).

This new AD retains the actions required by AD 2017- 19-17, and corrects the follow-on actions for certain airplanes. This AD was prompted by a determination that the follow-on actions specified in AD 2017-19-17 were incorrect for certain airplanes.

COST: The FAA estimates that this AD affects 52 airplanes of U.S. registry. The action required by AD 2017-19-17, and retained in this AD, takes about 5 work-hours per product, at an average labor rate of $85 per work-hour. Based on these figures, the estimated cost of the action that is required by AD 2017-19-17 is $425 per product.

This AD adds no new economic burden to AD 2017-19-17.

The FAA also estimate that any necessary follow-on actions will take about 19 work-hours and require parts costing $24,000, for a cost of $25,615 per product. The agency says it has no way of determining the number of aircraft that might need these actions.

DATES: This AD is effective December 1, 2017.

FMI: AD

Advertisement

More News

ANN's Daily Aero-Term (05.16.24): Instrument Runway

Instrument Runway A runway equipped with electronic and visual navigation aids for which a precision or nonprecision approach procedure having straight-in landing minimums has been>[...]

ANN's Daily Aero-Linx (05.16.24)

Aero Linx: Alaska Airmen's Association The Alaska Airmen's Association includes over 2,000 members—we are one of the largest General Aviation communities in the country. We s>[...]

Airborne 05.15.24: Ghost Sq MidAir, B-2 Junked, Dream Chaser Readies

Also: Flt School Security, G600 Steep-Approach, Honduran Aid, PW545D Cert Two aircraft performing at the Fort Lauderdale Air Show clipped wings during a routine last Sunday, spooki>[...]

Airborne 05.10.24: Icon Auction, Drunk MedEvac Pilot, Bell ALFA

Also: SkyReach Parts Support, Piper Service Ctr, Airliner Near-Miss, Airshow London The Judge overseeing Icon's convoluted Chapter 11 process has approved $9 million in Chapter 11 >[...]

Airborne Affordable Flyers 05.16.24: PRA Runway, Wag-Aero Sold, Young Eagles

Also: Paramotor Champ's, Electric Ultralight, ICON BK Update, Burt Rutan at Oshkosh! The Popular Rotorcraft Association is reaching out for help in rebuilding their private runway >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC