Gremlins Program Completes First Flight Test for X-61A Vehicle | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Fri, Jan 24, 2020

Gremlins Program Completes First Flight Test for X-61A Vehicle

Program Aims To Launch And Retrieve Low-Cost Unmanned Aerial Vehicles With Focus On Safety, Reliability, And Affordability

DARPA's Gremlins program has completed the first flight test of its X-61A vehicle. The test in late November at the U.S. Army’s Dugway Proving Ground in Utah included one captive-carry mission aboard a C-130A and an airborne launch and free flight lasting just over an hour-and-a-half.

The goal for this third phase of the Gremlins program is completion of a full-scale technology demonstration series featuring the air recovery of multiple, low-cost, reusable unmanned aerial systems (UASs), or “Gremlins.” Safety, reliability, and affordability are the key objectives for the system, which would launch groups of UASs from multiple types of military aircraft while out of range from adversary defenses. Once Gremlins complete their mission, the transport aircraft would retrieve them in the air and carry them home, where ground crews would prepare them for their next use within 24 hours.

The team met all objectives of the test in November, including gathering data on operation and performance, air and ground-based command and control systems, and flight termination. A parachute anomaly occurred in a recovery sequence that is specific to the test series and not part of the operational plan. The incident resulted in the loss of the test vehicle, one of five in the program. Four vehicles remain operational and available for the test series, which will continue in 2020.

"The vehicle performed well, giving us confidence we are on the right path and can expect success in our follow-on efforts," said Scott Wierzbanowski, the program manager for Gremlins in DARPA's Tactical Technology Office. "We got a closer look at vehicle performance for launch, rate capture, engine start, and transition to free flight. We had simulated the performance on the ground, and have now fully tested them in the air. We also demonstrated a variety of vehicle maneuvers that helped validate our aerodynamic data."

The next step for the program is a full evaluation of the test data, as well as to understand any issues related to the failure for the main parachute to deploy. The team anticipates the second flight test at Dugway in the spring 2020 timeframe to remain on track.

The C-130 is the demonstration platform for the Gremlins program, but Wierzbanowski says the Services could easily modify the system for another transport aircraft or other major weapons system. Gremlins also can incorporate several types of sensors up to 150 pounds, and easily integrate technologies to address different types of stakeholders and missions.

The U.S. Air Force designated the Gremlins air vehicle as X-61A in August in recognition of the technical challenges associated with the program.

A Dynetics-led team is the performer for the Phase 3 demonstration series.

(Image provided with DARPA news release)

FMI: www.darpa.mil

Advertisement

More News

ANN's Daily Aero-Term (04.25.24): Airport Rotating Beacon

Airport Rotating Beacon A visual NAVAID operated at many airports. At civil airports, alternating white and green flashes indicate the location of the airport. At military airports>[...]

ANN's Daily Aero-Linx (04.25.24)

Aero Linx: Fly for the Culture Fly For the Culture, Inc. is a 501(c)(3) non-profit organization that serves young people interested in pursuing professions in the aviation industry>[...]

Klyde Morris (04.22.24)

Klyde Is Having Some Issues Comprehending The Fed's Priorities FMI: www.klydemorris.com>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC