Near-Accident During Simulated Flight Delayed 737 MAX Recertification | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Thu, Nov 14, 2019

Near-Accident During Simulated Flight Delayed 737 MAX Recertification

Led To A Lengthy Redesign Of The Airplane's Computers

A near-accident during a simulated flight in June led to an extensive delay in the recertification of the 737 MAX, according to media reports.

Bloomberg reports that sources familiar with the incident indicated that the flight included a simulated computer glitch which caused an aggressive dive similar to those which led to two fatal accidents involving the airplane. That led to the extensive redesign of the computer systems which have delayed the airplane's reentry into service for months.

The sources said that the new problem goes beyond the initial issues that led to the accidents. While Boeing engineers had originally believed they could modify the MCAS, the problem that was discovered during the June simulation flight led to a complete redesign of the dual computer systems in the aircraft, which is considerably more complicated, according to The Hill. Former Boeing engineer Peter Lemme told Bloomberg that the number of scenarios that will need to be tested could be far more extensive.

The process has also been delayed by the FAA's requirements for documentation from Boeing. The agency is asking for additional documentation from the planemaker, which led to Boeing releasing a statement saying that it has been providing documentation "“in a format consistent with past submissions.”

“Regulators have requested that the information be conveyed in a different form, and the documentation is being revised accordingly,” the statement indicated.

“While this happens we continue to work with the FAA and global regulators on certification of the software for safe return of the MAX to service.”

Boeing has projected that the 737 MAX will return to service in January.

FMI: Source report
Source report

Advertisement

More News

ANN's Daily Aero-Term (04.25.24): Airport Rotating Beacon

Airport Rotating Beacon A visual NAVAID operated at many airports. At civil airports, alternating white and green flashes indicate the location of the airport. At military airports>[...]

ANN's Daily Aero-Linx (04.25.24)

Aero Linx: Fly for the Culture Fly For the Culture, Inc. is a 501(c)(3) non-profit organization that serves young people interested in pursuing professions in the aviation industry>[...]

Klyde Morris (04.22.24)

Klyde Is Having Some Issues Comprehending The Fed's Priorities FMI: www.klydemorris.com>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC