Discovery Crew Conducts Final Heat Shield Analysis | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Thu, Dec 21, 2006

Discovery Crew Conducts Final Heat Shield Analysis

Landing Scheduled For Friday

The STS-116 crew onboard the shuttle Discovery conducted a final inspection of the orbiter's heat shield Wednesday, in preparation for landing.

STS-116 Commander Mark Polansky, Pilot Bill Oefelein and Mission Specialist Nicholas Patrick used the shuttle’s robotic arm and boom extension sensor system to check the heat shield for any space junk or micrometeoroid hits that may have occurred while the orbiter was docked to the International Space Station.

Mission Specialists Bob Curbeam, Christer Fuglesang, Joan Higginbotham and Thomas Reiter are stowing items in preparation for the return to Earth. Discovery is slated to touch down at 3:56 pm EST Friday at Florida's Kennedy Space Center... but weather could force a delay, or a landing at an alterate site in New Mexico or California.

Two small scientific satellites were deployed from the payload bay Wednesday night. The Microelectromechanical System-Based PICOSAT Inspector (MEPSI) mini-satellite was released at 7:16 pm. MEPSI will demonstrate the use of tiny, low-power satellites to observe larger spacecraft by testing the function of small camera systems and gyroscopes.

The Radar Fence Transponder (RAFT) satellite was released 90 minutes later, at 8:56 pm. RAFT is a student experiment from the United States Naval Academy that uses picosatellites to test the Space Surveillance Radar Fence.

As Aero-News reported, Discovery undocked from the station Tuesday, ending an eight-day stay at the orbital outpost. While there, the crew continued the on-orbit construction of the station with the addition of the P5 spacer truss segment during the first of four spacewalks. The next two spacewalks were devoted to the rewiring of the station’s power system, leaving it in a permanent setup. A fourth spacewalk was added to allow the crew to retract solar arrays that had folded improperly.

Discovery also delivered a new crew member and more than two tons of equipment and supplies to the station. Almost two tons of items no longer needed on the station will return to Earth with STS-116.

European Space Agency astronaut Reiter is also returning with the Discovery crew, after his six month stay onboard the ISS as a member of both Expedition 13 and Expedition 14 crews.

FMI: www.nasa.gov/shuttle

Advertisement

More News

ANN's Daily Aero-Term (05.05.24): Omnidirectional Approach Lighting System

Omnidirectional Approach Lighting System ODALS consists of seven omnidirectional flashing lights located in the approach area of a nonprecision runway. Five lights are located on t>[...]

Aero-News: Quote of the Day (05.05.24)

"Polaris Dawn, the first of the program’s three human spaceflight missions, is targeted to launch to orbit no earlier than summer 2024. During the five-day mission, the crew >[...]

Airborne 05.06.24: Gone West-Dick Rutan, ICON BK Update, SpaceX EVA Suit

Also: 1800th E-Jet, Uncle Sam Sues For Landing Gear, Embraer Ag Plane, Textron Parts A friend of the family reported that Lt. Col. (Ret.) Richard Glenn Rutan flew west on Friday, M>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Aero-News: Quote of the Day (05.06xx.24)

“Our aircrews are trained and capable of rapidly shifting from operational missions to humanitarian roles. We planned to demonstrate how we, and our BORSTAR partners, respond>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC