NASA Looking At Boeing Starliner Thruster Performance | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Fri, Jan 24, 2020

NASA Looking At Boeing Starliner Thruster Performance

Source Says Many Elements Were Overstressed In Uncrewed Test Flight

The recent uncrewed test of Boeing's Starliner commercial crew system left NASA and Boeing with a lot of questions to answer, including whether another unmanned flight would be required before allowing humans to fly in the spacecraft.

ArsTechnica reports along with investigations of the "mission elapsed timer anomaly" which caused the spacecraft to miss its target orbit, and determining whether a second unmanned test should be performed, a source at the agency says the overall performance of the thruster system is also being evaluated.

Jim Chilton, Boeing's senior vice president of the Space and Launch division, said during a post-flight news conference that the service module thrusters were "stressed" due to their unconventional use as they tried to push the spacecraft into the planned orbit. The company shut down a manifold which carries fuel to four thrusters but still saw the pressure go low because "it had been used a lot."

The source told ArsTechnica that at least eight thrusters on the service module failed at one point, and one did not fire at all.

The joint investigation being conducted by Boeing and NASA will include an assessment of the overall propulsion system performance and figuring out what caused the anomaly. Both Boeing and NASA said any further discussion while the investigation is ongoing would be "premature."

(Image provided by NASA)

FMI: Source report

Advertisement

More News

ANN's Daily Aero-Term (04.25.24): Airport Rotating Beacon

Airport Rotating Beacon A visual NAVAID operated at many airports. At civil airports, alternating white and green flashes indicate the location of the airport. At military airports>[...]

ANN's Daily Aero-Linx (04.25.24)

Aero Linx: Fly for the Culture Fly For the Culture, Inc. is a 501(c)(3) non-profit organization that serves young people interested in pursuing professions in the aviation industry>[...]

Klyde Morris (04.22.24)

Klyde Is Having Some Issues Comprehending The Fed's Priorities FMI: www.klydemorris.com>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC