AD: M7 Aerospace LLC Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Mon, Oct 05, 2015

AD: M7 Aerospace LLC Airplanes

AD NUMBER: 2015-19-10

PRODUCT: Certain Models SA26-AT, SA26-T, SA226-AT, SA226-T, SA226-T(B), SA226-TC, SA227-AC (C-26A), SA227-AT, SA227-BC (C-26A), SA227-CC, SA227-DC (C-26B), and SA227-TT airplanes.

ACTION: Final Rule

SUMMARY: The FAA is superseding Airworthiness Directive (AD) 97-02-02 for the products listed above.

AD 97-02-02 required applying torque to the control column pitch bearing attaching nuts, inspecting the bearing assembly, inspecting the elevator control rod end bearing retainer/dust seals, and replacing or installing new parts as necessary.

This new AD requires inspecting for movement and correct torque of the elevator control pivot bearing, inspecting the elevator control rod for damage and correct configuration, and replacing parts as necessary. This AD also requires a 10,000-hour time-in-service (TIS) repetitive replacement of the control column pivot bearing and elevator control rod bolt and requires replacement of the control column pivot bearing with the improved design by 35,000 hours TIS.

This AD was prompted by loss of elevator control due to failure of the bolt attaching the elevator control rod to the elevator walking beam under the cockpit floor.

DATES: This AD is effective November 3, 2015

FMI: AD

Advertisement

More News

Aero-News: Quote of the Day (05.09.24)

"Fly-by-wire flight, coupled with additional capability that are being integrated into ALFA, provide a great foundation for Bell to expand on its autonomous capabilities. This airc>[...]

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Linx (05.09.24)

Aero Linx: B-21 Raider The B-21 Raider will be a dual-capable penetrating strike stealth bomber capable of delivering both conventional and nuclear munitions. The B-21 will form th>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC