SNC Selected For Phase Three Order To Aid Pilots In Degraded Visual Environment | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Sun, Nov 01, 2015

SNC Selected For Phase Three Order To Aid Pilots In Degraded Visual Environment

Utilizes Multi-Sensor See-Through Imaging System To Present Hi-Res images

Sierra Nevada Corporation (SNC) has been awarded a task order for the next phase of development for its Degraded Visual Environment Pilotage System (DVEPS). The indefinite-delivery/indefinite-quantity (IDIQ) contract with the United States Special Operations Command Technology Applications Contracting Office was initially awarded in 2013 to increase the safety of military aircrews worldwide.

SNC’s DVE Pilotage System will allow pilots to safely operate in degraded visual environments such as brownout, smoke, sand, snow, rain and fog conditions through the use of a multi-sensor, see-through imaging system that provides real-time, high-resolution fused imagery of the terrain and obstacles. This multi-aircraft, game-changing technology will increase aircrew situational awareness of obstacles throughout all phases of flight including people, power lines, ditches, mountains, rocks and other obstacles, reducing loss of life and equipment.

SNC was competitively selected for the third phase task order following a successful airborne test of its DVEPS program at the Yuma Proving Grounds in Arizona in June 2015. This airborne test demonstrated SNC’s ability to fuse multi-sensor data into real-time, high-fidelity imagery during operations in DVE conditions. The final contract phase includes Integrated System Development/Demonstration, Low-Rate Production and Qualification testing. The effort will begin in fiscal year 2016 with Developmental Flight Testing, leading to a Milestone C decision followed by Low-Rate Initial Production to support Qualification and Operational Testing.

“It is a great honor to have been selected for the third phase of this important life-saving and mission enabling program that will provide agile, flexible and economical technology to our country’s military.” said Greg Cox, corporate vice president for SNC’s Communication, Navigation and Surveillance/Air Traffic Management business area  “DVEPS combines unmatched performance in a reduced Size, Weight and Power (SWaP) envelope, creating a superior system that was unavailable at the start of the program. We look forward to finalizing this phase of the contract, leading to a Full-Rate Production decision in fiscal year 2017/2018.”

FMI: www.sncorp.com

Advertisement

More News

ANN's Daily Aero-Term (04.25.24): Airport Rotating Beacon

Airport Rotating Beacon A visual NAVAID operated at many airports. At civil airports, alternating white and green flashes indicate the location of the airport. At military airports>[...]

ANN's Daily Aero-Linx (04.25.24)

Aero Linx: Fly for the Culture Fly For the Culture, Inc. is a 501(c)(3) non-profit organization that serves young people interested in pursuing professions in the aviation industry>[...]

Klyde Morris (04.22.24)

Klyde Is Having Some Issues Comprehending The Fed's Priorities FMI: www.klydemorris.com>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC