Preparations For Arianespace’s Upcoming Launch Move Into Their Final Phase | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Tue, Aug 16, 2016

Preparations For Arianespace’s Upcoming Launch Move Into Their Final Phase

The Upper Portion Of Dual-Passenger Configuration Is Now Complete

The upper portion of Ariane 5’s dual-passenger configuration is now complete, with the Intelsat 33e satellite and SYLDA dispenser system encapsulated inside their protective payload fairing in preparation for an August 24 liftoff from French Guiana.

This activity took place in the Spaceport’s Final Assembly Building for Ariane 5, adjacent to where the heavy-lift launcher is waiting to receive both Intelsat 33e and the mission’s other passenger, Intelsat 36 – which was recently transferred into the same building from the S5 payload preparation facility.

The integration process’ next step will occur when Intelsat 36 is positioned on the launcher’s core section, allowing the configuration to be completed with installation of the Intelsat 33e/SYLDA/fairing combination atop it.

During the August 24 flight sequence, the payload fairing will be jettisoned first at approximately three minutes into the mission, followed by deployment of Intelsat 33e at the 28-minute mark. The SYLDA dispenser is then to be released, allowing Intelsat 36’s subsequent separation to complete the mission 41 minutes after liftoff.

Arianespace’s upcoming Ariane 5 flight, designated VA232 in the company’s launcher family numbering system, is scheduled during a launch window that opens at 6:55 p.m. and continues through 7:40 p.m., local time in French Guiana.

Intelsat 33e, produced by Boeing Space Systems, is the second Intelsat EpicNG-series spacecraft – following the first, Intelsat 29e, successfully orbited on an Ariane 5 mission performed in January. The satellite has a liftoff mass estimated at 6,575 kg. and will operate from an orbital position of 60 deg. East after launch.

The Intelsat 36 passenger, which was built by SSL (Space Systems Loral), has an estimated liftoff mass of 3,250 kg. After reaching its target orbit, the satellite will enhance Intelsat’s premier direct-to-home neighborhood in Africa from a 68.5 deg. East orbital slot.

(Images provided with Arianespace news release)

FMI: www.arianespace.com

Advertisement

More News

ANN's Daily Aero-Term (04.24.24): Runway Lead-in Light System

Runway Lead-in Light System Runway Lead-in Light System Consists of one or more series of flashing lights installed at or near ground level that provides positive visual guidance a>[...]

ANN's Daily Aero-Linx (04.24.24)

Aero Linx: Aviation Without Borders Aviation Without Borders uses its aviation expertise, contacts and partnerships to enable support for children and their families – at hom>[...]

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

Classic Aero-TV: Best Seat in The House -- 'Inside' The AeroShell Aerobatic Team

From 2010 (YouTube Version): Yeah.... This IS A Really Cool Job When ANN's Nathan Cremisino took over the lead of our Aero-TV teams, he knew he was in for some extra work and a lot>[...]

Airborne Affordable Flyers 04.18.24: CarbonCub UL, Fisher, Affordable Flyer Expo

Also: Junkers A50 Heritage, Montaer Grows, Dynon-Advance Flight Systems, Vans' Latest Officially, the Carbon Cub UL and Rotax 916 iS is now in its 'market survey development phase'>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC