SpaceX Announces Arrival Of Final Falcon 9 Flight Hardware At Cape Canaveral | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Fri, Feb 12, 2010

SpaceX Announces Arrival Of Final Falcon 9 Flight Hardware At Cape Canaveral

Preparations Continue For Inaugural Launch

Space Exploration Technologies (SpaceX) says that all of the flight hardware for the debut launch of the Falcon 9 vehicle has arrived at the SpaceX launch site, Space Launch Complex 40 (SLC-40), in Cape Canaveral, Florida.

Final delivery included the Falcon 9 second stage, which recently completed testing at SpaceX's test facility in McGregor, Texas. SpaceX has now initiated full vehicle integration of the 47 meter (154 feet) tall, 3.6 meter (12 feet) diameter rocket, which will include a Dragon spacecraft qualification unit.

"We expect to launch in one to three months after completing full vehicle integration," said Brian Mosdell, Director of Florida Launch Operations for SpaceX. "Our primary objective is a successful first launch and we are taking whatever time necessary to work through the data to our satisfaction before moving forward."

Following full vehicle integration, SpaceX will conduct a static firing to demonstrate flight readiness and confirm operation of ground control systems in preparation for actual launch.

Artist's Rendering

Though designed from the beginning to transport crew, SpaceX's Falcon 9 launch vehicle and Dragon spacecraft will initially be used to transport cargo. Falcon 9 and Dragon were selected by NASA to resupply the International Space Station (ISS) once Shuttle retires. The $1.6B contract represents 12 flights for a minimum of 20 tons to and from the ISS with the first demonstration flights beginning in 2010.

FMI: www.spacex.com

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC