Emergency AD: Airbus Helicopters Model EC225LP Helicopters | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Sun, Jul 10, 2022

Emergency AD: Airbus Helicopters Model EC225LP Helicopters

Emergency AD# 2022-14-51 Requires One-Time Visual Inspections And, Depending On The Results, Accomplishing Additional Inspections

This emergency AD was prompted by a report of a cracked main rotor head (MRH) sleeve.

This emergency AD requires one-time visual inspections and, depending on the results, accomplishing additional inspections, repairing the MRH sleeve in accordance with a certain approval, and removing the MRH sleeve from service and installing an airworthy part. This emergency AD also prohibits installing an MRH sleeve unless certain inspections have been accomplished. This condition, if not addressed, could result in failure of an MRH sleeve, loss of a main rotor blade, and subsequent loss of the helicopter. The European Union Aviation Safety Agency (EASA), which is the Technical Agent for the Member States of the European Union, has issued EASA Emergency AD 2022-0130-E, dated June 30, 2022 (EASA AD 2022-0130-E), to correct an unsafe condition for Airbus Helicopters (AH), formerly Eurocopter, Model EC 225 LP helicopters. EASA advises of a crack in an MRH sleeve that investigation determined was a fatigue crack that had initiated from a corrosion pit located in an area with chipped paint. Accordingly, EASA AD 2022-0130-E requires initial one-time detailed visual inspections of MRH sleeve part number (P/N) 332A31-3071-00 and depending on the results, follow-on repetitive inspections and corrective actions.

Emergency AD Requirements: This emergency AD requires visually inspecting the “Specific area” of each MRH sleeve P/N332A31-3071-00 for flaking and paint touch-up. If there is any flaking or paint touch-up, this emergency AD requires visually inspecting the “Specific area” of the MRH sleeve for a crack.

As a result of the visual inspection, if there is a crack, this emergency AD requires removing the MRH sleeve from service and installing an airworthy part. If there is not a crack, this emergency AD requires an inspector with a certain qualification using high-frequency eddy current (HFEC) to inspect the “Specific area” of the MRH sleeve for a crack.

As a result of the HFEC, if there is a crack, this emergency AD requires removing the MRH sleeve from service and installing an airworthy part. If there is not a crack, this emergency AD requires chemically stripping and fluorescent penetrant inspecting (FPI) the “Specific area” of the MRH sleeve for corrosion.

As a result of the FPI, if there is corrosion, this emergency AD requires removing the corrosion by hand and repeating the FPI of each affected area to inspect for corrosion, and depending on the subsequent results, removing the MRH sleeve from service and installing an airworthy part; or drying the MRH sleeve, applying a protective coating, primer, and paint protection, and having an inspector with a certain qualification using HFEC repetitively inspect the “Specific area” of the MRH sleeve for a crack. If there is a crack, this emergency AD requires removing the MRH sleeve from service and installing an airworthy part.However, if the corrosion cannot be removed by hand, this emergency AD requires removing the MRH sleeve from service and installing an airworthy part or repairing the MRH sleeve in accordance with a certain approved method.

As a result of the first FPI,if there is no corrosion, this emergency AD requires applying primer and paint protection.As an option to the first FPI and its follow-on actions, if there is not a crack, this emergency AD allows applying primer and paint protection or, for any area swith flaking paint, applying only varnish instead of primer and paint protection on each flaking paint area; and having an inspector with a certain qualification using HFEC to repetitively inspect the “Specific area” of the MRH sleeve for a crack. If there is a crack, this emergency AD requires removing the MRH sleeve from service and installing an airworthy part. This emergency AD also prohibits installing an MRH sleeve unless specified one-time visual inspections have been accomplished.

FMI: www.regulations.gov

Advertisement

More News

ANN's Daily Aero-Term (05.05.24): Omnidirectional Approach Lighting System

Omnidirectional Approach Lighting System ODALS consists of seven omnidirectional flashing lights located in the approach area of a nonprecision runway. Five lights are located on t>[...]

Aero-News: Quote of the Day (05.05.24)

"Polaris Dawn, the first of the program’s three human spaceflight missions, is targeted to launch to orbit no earlier than summer 2024. During the five-day mission, the crew >[...]

Airborne 05.06.24: Gone West-Dick Rutan, ICON BK Update, SpaceX EVA Suit

Also: 1800th E-Jet, Uncle Sam Sues For Landing Gear, Embraer Ag Plane, Textron Parts A friend of the family reported that Lt. Col. (Ret.) Richard Glenn Rutan flew west on Friday, M>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Aero-News: Quote of the Day (05.06xx.24)

“Our aircrews are trained and capable of rapidly shifting from operational missions to humanitarian roles. We planned to demonstrate how we, and our BORSTAR partners, respond>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC