Endeavour Hydrogen Leak Repairs Continue | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Wed, Jun 24, 2009

Endeavour Hydrogen Leak Repairs Continue

"Tanking Test" Set For Next Week

At NASA's Kennedy Space Center in Florida, teams are working to evaluate and repair a plate that attaches a gaseous hydrogen vent line to space shuttle Endeavour's external fuel tank. Hydrogen leaks in the area of the Ground Umbilical Carrier Plate, or GUCP, postponed Endeavour's launch attempts June 13 and 17, delaying its 16-day flight to the International Space Station.

The Ground Umbilical Carrier Plate platform was partially extended Monday to allow technicians to continue their ongoing engineering analysis and to verify exact measurements of the position of the plate. The explosive bolts that connect the vent line to the external tank were safely disconnected, and GUCP leak checks were performed at ambient temperatures using helium gas. No leaks were detected. Previously, the only time leaks were seen were during launch attempts when super cold hydrogen gas was being passed through the vent line.

The repairs will be confirmed by a "tanking test" within the next week, in which Endeavour's external tank will be filled with liquid hydrogen and liquid oxygen, just as it is before launch. If the repairs are successful, Endeavour's next launch attempt will be targeted for July 11 at 1939 EDT.

Today, Endeavour's astronauts will catch up on administrative work and take T-38 training jet flights from their home base at NASA's Johnson Space Center in Houston to El Paso and back.

FMI: www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Linx (05.02.24)

Aero Linx: Model Aeronautical Association of Australia MAAA clubs are about fun flying, camaraderie and community. For over 75 years, the MAAA has been Australia’s largest fl>[...]

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

NTSB Final Report: Cirrus Design Corp SR20

Student Pilot Reported That During Rotation, “All Of A Sudden The Back Of The Plane Kicked To The Right..." Analysis: The student pilot reported that during rotation, “>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC