Orion Spacecraft Arrives At Launch Pad 37 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Fri, Nov 14, 2014

Orion Spacecraft Arrives At Launch Pad 37

Integrated Onto Delta IV Heavy Rocket

NASA’s new Orion spacecraft now is at its launch pad after completing final journey in the early hours Wednesday. It arrived at Space Launch Complex 37 at Cape Canaveral Air Force Station in Florida at 0307 EST, where the spacecraft then was lifted onto a United Launch Alliance Delta IV Heavy rocket in preparation for its first trip to space.

Orion will travel almost 60,000 miles into space Thursday, Dec. 4, during an uncrewed flight designed to test many of the spacecraft’s systems before it begins carrying astronauts on missions to deep-space destinations.

The spacecraft, which includes the crew and service modules, launch abort system and the adapter that will connect it to the rocket, was completed in October and has since been awaiting its rollout inside the Launch Abort System Facility at NASA’s Kennedy Space Center in Florida. Although storms in the area delayed its move slightly, Orion completed its 22-mile journey with no issues.

"This is the next step on our journey to Mars, and it’s a big one," said William Gerstenmaier, NASA’s associate administrator for Human Exploration and Operations. “In less than a month, Orion will travel farther than any spacecraft built for humans has been in more than 40 years. That's a huge milestone for NASA, and for all of us who want to see humans go to deep space.”

Once it arrived at Space Launch Complex 37, Orion was hoisted up about 200 feet and placed atop the Delta IV Heavy rocket that will carry it into orbit. Over the course of the three weeks that remain until liftoff, the spacecraft will be fully connected to the rocket and powered on for final testing and preparations.

"We've put a lot of work into designing, building and testing the spacecraft to get it to this point and I couldn’t be prouder of the whole team,” said Mark Geyer, Orion Program manager. “Now it’s time to see how it flies. Sending Orion into space will give us data that is going to be critical to improving the spacecraft's design before we go to an asteroid and Mars.”

Orion is scheduled to lift off at 0705 Dec. 4. During its two-orbit, 4.5-hour flight test, Orion will travel 3,600 miles beyond Earth. From this distance, Orion will return through Earth's atmosphere at speeds approaching 20,000 mph, generating temperatures near 4,000 degrees Fahrenheit on its heat shield. The flight will allow engineers to test systems critical to safety, including the heat shield, parachutes, avionics and attitude control.

(Images provided by NASA)

FMI: www.nasa.gov/orion

Advertisement

More News

ANN's Daily Aero-Term (04.24.24): Runway Lead-in Light System

Runway Lead-in Light System Runway Lead-in Light System Consists of one or more series of flashing lights installed at or near ground level that provides positive visual guidance a>[...]

ANN's Daily Aero-Linx (04.24.24)

Aero Linx: Aviation Without Borders Aviation Without Borders uses its aviation expertise, contacts and partnerships to enable support for children and their families – at hom>[...]

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

Classic Aero-TV: Best Seat in The House -- 'Inside' The AeroShell Aerobatic Team

From 2010 (YouTube Version): Yeah.... This IS A Really Cool Job When ANN's Nathan Cremisino took over the lead of our Aero-TV teams, he knew he was in for some extra work and a lot>[...]

Airborne Affordable Flyers 04.18.24: CarbonCub UL, Fisher, Affordable Flyer Expo

Also: Junkers A50 Heritage, Montaer Grows, Dynon-Advance Flight Systems, Vans' Latest Officially, the Carbon Cub UL and Rotax 916 iS is now in its 'market survey development phase'>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC