ILS Concludes Its Review Of Centenario Proton Launch Failure Investigation | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Thu, Aug 06, 2015

ILS Concludes Its Review Of Centenario Proton Launch Failure Investigation

Agree That Higher Than Expected Vibrations Led To The Loss Of The Spacecraft

The International Launch Services (ILS) Failure Review Oversight Board (FROB) has concluded its work associated with the May 16 Proton launch failure that led to the loss of a Centenario cargo vessel carrying supplies for the ISS.

The ILS concurred with the most probable cause and the associated corrective action plan which were identified by the Russian Interagency Commission (IAC) as a result of the May 16 Proton launch vehicle failure carrying the Centenario spacecraft.

The members of the FROB reviewed the findings and conclusions from the IAC along with results from testing and investigations that the IAC directed to be performed by Khrunichev and their subsidiaries.

Based on the data presented by KhSC, the FROB agreed that the most probable cause of the failure was a result of a higher than expected vibration environment most likely caused by the combination of a marginal mechanical joint used to mount the Stage III steering engine turbo pump and a steering engine turbopump rotor material that had marginal strength under maximum operating environments. This led to a premature shutdown of the turbopump and loss of Stage III control authority and subsequently to the failure of the mission during 3rd stage operation approximately 497 seconds after liftoff.

“The participating customers, insurance underwriters and independent subject matter experts are to be commended for their valuable contributions during the extensive FROB review process. We thank our customers for their support as we prepare for the safe return to flight of ILS Proton,” said ILS Vice President and Chief Technical Officer, John Palmé.

(Proton rocket launch image from file)

FMI: www.ilslaunch.com

Advertisement

More News

ANN's Daily Aero-Term (04.25.24): Airport Rotating Beacon

Airport Rotating Beacon A visual NAVAID operated at many airports. At civil airports, alternating white and green flashes indicate the location of the airport. At military airports>[...]

ANN's Daily Aero-Linx (04.25.24)

Aero Linx: Fly for the Culture Fly For the Culture, Inc. is a 501(c)(3) non-profit organization that serves young people interested in pursuing professions in the aviation industry>[...]

Klyde Morris (04.22.24)

Klyde Is Having Some Issues Comprehending The Fed's Priorities FMI: www.klydemorris.com>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC