NASA's Hale Stresses Need For Continuous Improvement On Shuttle Program | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Fri, Jun 02, 2006

NASA's Hale Stresses Need For Continuous Improvement On Shuttle Program

More Changes To External Tank On Tap After Discovery's Flight

A lot has been done... but there's still a lot of work to do. That was the word from space shuttle program manager Wayne Hale Wednesday, as he told reporters that while Discovery is slated to fly into orbit next month with a much-modified -- and hopefully safer -- external fuel tank, scientists have not stopped looking for more ways to reduce the likelihood that insulating foam will break off during launch, and potentially damage the orbiter.

"We are on a road for continuous improvement," Hale said at a news conference. "We are trying to eliminate the biggest hazards and work our way on down."

At the very top of that list of hazards were the old tank's protuberance air load ramps, or PALs, that were originally designed to divert airflow away from plumbing and electrical connections between the tank and the orbiter.

Since the last shuttle flight, scientists have removed the two ramps -- which were 38.5- and 14.5-feet long -- in order to eliminate the source of foam fragment that doomed Columbia in February 2003, and caused many tense moments during Discovery's first Return-to-Flight mission last August.

Although two sources of foam breakage have been eliminated, Hale said there's more work to be done.

"We have found no showstoppers. We believe we have made significant improvements," said Hale. "There will continue to be foam coming off the external tank. What we have done in a very systematic manner is eliminated the largest hazards."

Next on the list of changes to the massive fuel tank will be the elimination of 34 foam fixtures, each weighing 1 to 2 pounds, that insulate a row of metal brackets called "ice frost ramps".

Hale said these pose the biggest challenge to Discovery's upcoming flight, slated to liftoff July 1. However, changes to the ramps aren't expected to fly until later shuttle missions in 2007.

FMI: www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Term (05.10.24): Takeoff Roll

Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]

Aero-News: Quote of the Day (05.10.24)

“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]

Airborne 05.06.24: Gone West-Dick Rutan, ICON BK Update, SpaceX EVA Suit

Also: 1800th E-Jet, Uncle Sam Sues For Landing Gear, Embraer Ag Plane, Textron Parts A friend of the family reported that Lt. Col. (Ret.) Richard Glenn Rutan flew west on Friday, M>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Aero-News: Quote of the Day (05.11.24)

"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC