Amateur-Built Flight Testing Criteria About To Change | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-Unlimited-04.23.24

Airborne-Unlimited-04.24.24 Airborne-FltTraining-04.25.24

Airborne-Unlimited-04.26.24

Fri, Apr 02, 2021

Amateur-Built Flight Testing Criteria About To Change

Task-Based Phase I to Revolutionize Flight Testing

EAA has reported that the FAA has published draft guidance to implement an optional task-based Phase I program for Experimental Amateur-Built (E-AB) aircraft. Under the program, once an aircraft completes a flight test plan that meets FAA standards, Phase I is complete. The standard 25- or 40-hour flight test period for Phase I will remain an option for all E-AB, and Experimental Light-Sport (E-LSA) continues to carry a 5-hour test period.

The program is part of an upcoming update to Advisory Circular (AC) 90-89B. Flight test programs do not need specific approval by the FAA, but the Circular lays out certain required flight test points and requires the use of test cards for data collection in flight. Users of the EAA Flight Test Manual should find it a straightforward way to complete the requirements of the task-based Phase I program, but anyone may draft a flight test plan that meets the FAA's outline, including kit manufacturers and other experts.

Task-based Phase I ensures that every hour spent in flight testing is meaningful and is contributing to both validating the airworthiness of the aircraft and gathering the data necessary to build a detailed operating manual. This will benefit the builder in ensuring full exploration of the aircraft's operating envelope, and it will benefit subsequent owners in having access to quality data on the aircraft. In exchange for this work, the aircraft will be released from Phase I when it is ready, not based on an arbitrary time requirement.

"This is the result of more than eight years of work by EAA and the FAA and we couldn't be happier that it is now nearing completion," said Tom Charpentier, EAA Government Relations Director. "This will be a true paradigm shift in E-AB flight testing."

This program comes on the heels of EAA's publication of its Flight Test Manual in 2018, which has sold thousands of copies to date. EAA is continuously working to improve it and create new materials and programming based upon the manual.

Task-based Phase I is yet another example of the EAA working collaboratively with the FAA to achieve a win-win solution that benefits the community and enhances safety. The groundwork for this change was laid by the EAA/FAA working group that created the Additional Pilot Program (AC 90-116), which allows another pilot into the cockpit to enhance safety during flight testing.

The Advisory Circular is in draft form and comments will be accepted through April 29. Please note that the relevant language on Task-Based Phase I is housed in Chapter 1, Section 1 of the draft. The rest of the document contains advisory information on flight testing and is not part of the task-based program requirements.

FMI: www.eaa.org, www.faa.gov, www.faa.gov/aircraft/draft_docs/media/afx/AC_90-89B_CHG_1_Coord_Copy.pdf, www.faa.gov/aircraft/draft_docs/afs_ac/
 
 


Advertisement

More News

ANN's Daily Aero-Term (04.28.24): Airport Marking Aids

Airport Marking Aids Markings used on runway and taxiway surfaces to identify a specific runway, a runway threshold, a centerline, a hold line, etc. A runway should be marked in ac>[...]

Aero-News: Quote of the Day (04.28.24)

"It is extremely difficult, if not impossible, for manned aircraft to see a drone while conducting crop-enhancing and other aerial applications at low altitudes and high speeds. We>[...]

ANN's Daily Aero-Linx (04.28.24)

Aero Linx: The Skyhawk Association The Skyhawk Association is a non-profit organization founded by former Skyhawk Pilots which is open to anyone with an affinity for the A-4 Skyhaw>[...]

Aero-News: Quote of the Day (04.29.24)

“The T-54A benefits from an active Beechcraft King Air assembly line in Wichita, Kansas, where all required METS avionics and interior modifications are installed on the line>[...]

ANN's Daily Aero-Linx (04.29.24)

Aero Linx: Aerostar Owners Association The Association offers the Aerostar Owner a unique opportunity to tap an invaluable source of information concerning the care and feeding of >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC