NASA 'Thrilled' With Early Results Of Tile Repair Test | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-09.16.24

Airborne-NextGen-09.17.24

Airborne-Unlimited-09.18.24

Airborne-FlightTraining-09.19.24

Airborne-Unlimited-09.20.24

Sat, Mar 22, 2008

NASA 'Thrilled' With Early Results Of Tile Repair Test

Combined STS-123, ISS Crew Prepares For Last Spacewalk

The verdict is still out on whether a new heat-shield tile repair method will prove to be the kind of solution NASA has been looking for... but early results are very promising.

As ANN reported, Mission Specialists Michael Foreman and Robert Behnken tested the new procedure Thursday, during the fourth of five planned spacewalks during the shuttle Endeavour's extended stay at the ISS. As part of the 6 1/2-hour excursion, the two men used a device similar to a high-tech caulk gun to insert ablative putty into cracks on a sample tile, then using a brush to smooth the material out.

The 'goo' later solidifies into a plastic-like material, reports The Associated Press, which NASA hopes will prove to be able to withstand the heat generated during reentry. "We are absolutely captivated by what you guys are doing here," Mission Control radioed the spacewalkers during Thursday's test. "You're like brain surgeons up there."

While the new method is similar to previous repair attempts -- which have yielded mixed results -- NASA hopes the new material will be resistant to what the agency dubs the 'rising bread-loaf' effect... in which bubbles form in the material, causing it to swell out from the repair site. STS-123 lead spacewalk officer Zebulon Scoville says so far, the results are encouraging.

"We're just thrilled with the way it turned out," he said, adding final results must wait until the sample is tested on Earth.

Even if the material proves successful, however, it will fall short of being a silver-bullet solution for the kind of damage that led to the 2003 loss of Columbia on reentry. Currently, the repair material is only intended for the silica tiles on the shuttle's underside, and other surfaces exposed to lower heat levels than the reinforced carbon panels lining the leading edges of the shuttle's wings... where damage doomed Columbia.

In related news, on Friday the crew checked Endeavour's wings and nose for signs of micrometeorite damage that may have occurred during the orbiter's stay at the station. That test is usually done after a shuttle undocks from the ISS, but the 100-foot Orbiter Boom Sensor System (OBSS) mounted to Endeavour's robotic arm will have to be left behind at the station, for the crew of STS-124 to use later this year... as every nook and cranny in Discovery's cargo bay will be occupied by the second segment of the Japanese Kibo module.

The Expedition 16 and STS-123 crews spent the remainder of Friday configuring tools and reviewing procedures for the flight’s final spacewalk. This includes the standard "camp out" in the station’s Quest airlock, during which the nitrogen is purged from the bodies of spacewalkers before they enter the void of space.

Behnken and Foreman will begin that spacewalk at 1723 EDT Saturday. Their tasks include stowing the OBSS on the station’s S1 Truss, where it will be picked up by the STS-124 crew aboard space shuttle Discovery, set to launch in May.

Endeavour is scheduled to undock from the station Monday, and return to earth at 2035 EDT March 26.

FMI: www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Term (09.17.24): Instrument Approach Procedure (IAP) Charts

Instrument Approach Procedure (IAP) Charts Portray the aeronautical data which is required to execute an instrument approach to an airport. These charts depict the procedures, incl>[...]

Aero-News: Quote of the Day (09.17.24)

“Our industry is approaching a 30-year innovation cycle, and we have less than 25 years to decarbonize aviation. We need to develop new methods to get net zero aerospace tech>[...]

Airborne 09.16.24: Bristell Shooting, EAA v FAA, Boeing Strike!

Also: Girls in Aviation Day, B-29 Doc Heads 4 Chino, C-17 Tail Cone Detaches, Bulgaria Airshow Accident One of two private aircraft that launched from Apatity Airport near Murmansk>[...]

Classic Aero-TV: CubCrafters NX Cub-A Stunning Effort To Build The ‘Perfect Cub'

From 2021 (YouTube Version): We Were Blown Away At How Well The Nosewheel Was Adapted To The X Cub Airframe It should not be a secret to any one of you, that with thousands of hour>[...]

Airborne 09.18.24: Boom XB-1 3rd Test, DJI Ban, SubSonex To EAA Museum

Also: Volato Nixed by Honda, New B-21 Bases, A-10 Unit Inactivated, Gogo/Airshare Boom Supersonic announced its demonstrator aircraft XB-1 successfully completed its third test fli>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC