Historic Spacewalk Postponed | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Sat, Jun 26, 2004

Historic Spacewalk Postponed

Leak in Russian spacesuit O2 bottle forces cancellation

A spacewalk intended to replace a faulty circuit breaker on the exterior of the International Space Station was cut short when the primary oxygen bottle on Astronaut Mike Fincke's Russian space suit began losing pressure faster than expected. The overall pressure in Fincke's suit remained stable at all times and he was not in danger. A backup oxygen tank available on his suit was not needed.

Fincke and Expedition 9 Commander Gennady Padalka opened the Pirs docking compartment hatch at 16:56 CDT. Immediately after Fincke floated out of the airlock, flight controllers in Moscow saw readings that indicated the primary oxygen bottle on Fincke's suit was losing pressure.

The two spacewalkers returned to the airlock and closed the hatch about 14 minutes later. After conducting preliminary troubleshooting activities, Padalka and Fincke were asked to remove the Orlan-M spacesuits and assist with troubleshooting of Fincke's suit. Russian flight controllers could not immediately determine the cause of the malfunction.

Fincke and Padalka then climbed out of the suits, returned to the Station's living quarters and began working with ground controllers to reconfigure the Station's systems for normal operations. The duration of Fincke and Padalka's spacewalk was 14 minutes, 22 seconds.

Mission managers in Houston and Moscow agreed to conduct further evaluation of the problem before setting a new target date for the spacewalk. The earliest the spacewalk could now be performed is June 29 based on Russian ground communications coverage.

Fincke told Mission Control in Houston that he was pleased flight controllers in Moscow had discovered the oxygen tank problem so quickly, and thanked both control teams for their efforts. He indicated the crew would sleep late tomorrow, and then resume their regular sleep schedule until it was time to prepare for another spacewalk.

The spacewalk's goal is to replace a Remote Power Controller Module (RPCM) which houses a faulty circuit breaker, through which power is routed to one of the Control Moment Gyroscopes (CMGs).

There are four CMGs in the Station's Z1 truss. They control the orientation of the ISS in space.  CMG 1 failed about two years ago, and will be replaced during the next Shuttle mission. CMG 2 was taken off line by the April 21 failure of the circuit breaker and should be restored by the RPCM's replacement. Meanwhile, two functioning CMGs adequately control the station's attitude.

FMI: http://spaceflight.nasa.gov/, http://scipoc.msfc.nasa.gov/

Advertisement

More News

ANN's Daily Aero-Term (04.24.24): Runway Lead-in Light System

Runway Lead-in Light System Runway Lead-in Light System Consists of one or more series of flashing lights installed at or near ground level that provides positive visual guidance a>[...]

ANN's Daily Aero-Linx (04.24.24)

Aero Linx: Aviation Without Borders Aviation Without Borders uses its aviation expertise, contacts and partnerships to enable support for children and their families – at hom>[...]

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

Classic Aero-TV: Best Seat in The House -- 'Inside' The AeroShell Aerobatic Team

From 2010 (YouTube Version): Yeah.... This IS A Really Cool Job When ANN's Nathan Cremisino took over the lead of our Aero-TV teams, he knew he was in for some extra work and a lot>[...]

Airborne Affordable Flyers 04.18.24: CarbonCub UL, Fisher, Affordable Flyer Expo

Also: Junkers A50 Heritage, Montaer Grows, Dynon-Advance Flight Systems, Vans' Latest Officially, the Carbon Cub UL and Rotax 916 iS is now in its 'market survey development phase'>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC