Airbus Group To Build E-Fan Electric Aircraft Assembly Line In Pau | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Fri, May 01, 2015

Airbus Group To Build E-Fan Electric Aircraft Assembly Line In Pau

Will invest € 20 Million In The E-Fan 2.0 project

Airbus Group has agreed with the Aquitaine region to build the Final Assembly Line (FAL) for the E-Fan 2.0 all-electric aircraft in Pau, southwest France. The decision was announced by Airbus Group Chief Technical Officer (CTO) Jean Botti and Alain Rousset, President of the Aquitaine region, during a press conference in Bordeaux, the capital city of Aquitaine.

“We have reached the next milestone in our Airbus Group E-Aircraft roadmap. The industrialisation of our E-Fan aircraft will help us to advance electric flight and also to gain experience to scale up the technology,” said Jean Botti, Airbus Group CTO. “With this new assembly line, Airbus Group is preparing for the future and creating new jobs and business in the Aquitaine region,” he added.

Voltair SAS, created in 2014 and owned 100 percent by Airbus Group, will manage the E-Fan development, production and delivery in the Pau area. Voltair will also be in charge of selling and providing services like maintenance for the E-Fan aircraft.

Airbus Group will invest € 20 million (approx $22.3 million) in the overall design and development of the E-Fan 2.0 aircraft, in addition to contributions from Airbus Group’s partners. The consortium is supported by La Nouvelle France Industrielle. The Aquitaine region is also supporting the project through a regional subsidy and the FEDER (Le Fonds Européen de Développement Regional) investment for a total of € 2.25 million (approx. $2.52 million).

Pau, which is already a regional center for the aeronautics industry in France, was chosen as it is located close to design partner Daher and offers direct access to the runway, a medium size airport and good meteorological conditions. The purchase of the site from the current owner is due to be signed by mid-year 2015 with construction works for the FAL scheduled to start in the middle of 2016. The targeted goal for entry-into-service of the first E-Fan 2.0 is around the end of 2017 or beginning of 2018. E-Fan 2.0 is a key project in the industrial plans launched by the French government in 2013.

Airbus Group will bring its electric technical demonstrator aircraft, E-Fan, into serial production with the E-Fan 2.0, a two-seater version dedicated to initial pilot training. Airbus Group’s E-Fan project started in 2012 with an intensive development phase of more than 12 months. The demonstrator aircraft was first presented at the Paris Air Show in 2013. Since its first flight on 11 March 2014, the E-Fan has performed more than 78 test flights with more than 38 flight hours in total.

(Images provided by Airbus)

FMi: www.airbusgroup.com/e-fan

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC