Lockheed Martin Will Build T-50A At South Carolina Facility | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Wed, May 25, 2016

Lockheed Martin Will Build T-50A At South Carolina Facility

Aircraft Being Offered As T-38 Replacement

As the U.S. Air Force works toward replacing the T-38 Talon as its primary jet trainer, Lockheed Martin's Greenville, SC facility is prepping to build the T-50A, which the company will offer as the replacement for the T-38.

The Talon is in its fifth decade of training Air Force pilots. LMC announced back in February that it would be offering the T-50A in the U.S. Air Force’s Advanced Pilot Training (APT) competition. The T-50A was developed jointly by Lockheed Martin and Korea Aerospace Industries (KAI). At the same time, the company said that the Greenville plant was the preferred Final Assembly and Checkout (FACO) site for the T-50A.

“The T-50A is production ready now. It is the only offering that meets all of the APT requirements and can deliver those capabilities on schedule,” Rob Weiss, executive vice president and general manager, Lockheed Martin Advanced Development Programs (Skunk Works), said in a news release in February. “We carefully studied a clean-sheet option for the [Advanced Pilot Training] competition and determined that it posed excessive risk to the APT cost and schedule requirements.”

The Columbia Business Report indicates that the company has started converting Hangar 11 at the Greenville facility for production of the T-50A. The building was originally constructed in 1958, and Don Erickson, site director for Lockheed Martin’s Greenville operations facility located at the S.C. Technology and Aviation Center, said that the conversion would include a new interior roof, office spaces, and fresh paint on the floor. If Lockheed Martin wins the $10 to $11 billion contract, it would produce four aircraft per month at the Greenville facility.

The Air Force is expected to announce the winner of the competition in late 2017 or early 2018.

(Images provided by Lockheed Martin)

FMI: http://www.lockheedmartin.com/us/products/t50A.html

Advertisement

More News

ANN's Daily Aero-Linx (05.02.24)

Aero Linx: Model Aeronautical Association of Australia MAAA clubs are about fun flying, camaraderie and community. For over 75 years, the MAAA has been Australia’s largest fl>[...]

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

NTSB Final Report: Cirrus Design Corp SR20

Student Pilot Reported That During Rotation, “All Of A Sudden The Back Of The Plane Kicked To The Right..." Analysis: The student pilot reported that during rotation, “>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC