AEA And Industry Coalition Urge FCC To Reconsider Approval Of Ligado 5G Network | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Thu, Jun 04, 2020

AEA And Industry Coalition Urge FCC To Reconsider Approval Of Ligado 5G Network

Ligado, Formerly Known As LightSquared, Failed Twice In Recent Years To Win Approval

On June 3, the AEA and a group of 69 aviation organizations wrote to Marlene H. Dortch, secretary of the Federal Communications Commission, in support of a petition for stay filed by the National Telecommunications and Information Administration.

The petition to the FCC was filed May 22, and it opposed the FCC’s April 20 order of approval for Ligado Networks’ proposed high-speed broadband cellular network operating near frequency bands currently used by GPS and satellite communications networks.

The petition noted a variety of concerns with the FCC’s April 20 order of approval for the nationwide 5G cellular service, including Ligado’s failure to sufficiently demonstrate its ability to not interfere with other frequencies. It also questioned the FCC’s approval without conducting a public review of the draft order.

In part, the June 3 letter to Dortch supporting the petition stated: “The petition (as well as the numerous petitions for reconsideration filed against the Ligado order) demonstrates conclusively that the order presents serious and unresolved legal and factual questions, that grant of the stay will not harm others, and that a stay is necessary to prevent serious harm arising from harmful interference into mission-critical GPS devices and satellite communications. In short, the public interest strongly favors maintaining the status quo during the pendency of NTIA’s petition for reconsideration, and the Commission should grant the petition.”

The letter continued: “Ligado’s operations would affect too many federal GPS devices for repair or replacement to be feasible, and the conditions fail to account for the classified nature of the military GPS uses or the fact that many affected receivers are embedded into military hardware and weapons systems. Moreover, as the several petitions for reconsideration from the aviation sector also show, the conditions fail to provide sufficient protection to ensure safety of flight throughout critical aeronautical operations including near Ligado base stations, especially by medical emergency helicopters and other low-altitude flight operations.”

Ligado, formerly known as LightSquared, failed twice in recent years to win approval for deployment of its low-power 5G network.

FMI: www.aea.net

Advertisement

More News

Aero-News: Quote of the Day (05.09.24)

"Fly-by-wire flight, coupled with additional capability that are being integrated into ALFA, provide a great foundation for Bell to expand on its autonomous capabilities. This airc>[...]

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Linx (05.09.24)

Aero Linx: B-21 Raider The B-21 Raider will be a dual-capable penetrating strike stealth bomber capable of delivering both conventional and nuclear munitions. The B-21 will form th>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC