Army Accepts 100th Apache 'Echo' Model | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Mon, Apr 13, 2015

Army Accepts 100th Apache 'Echo' Model

Represents A Complete Rebuild Of The 'D' Model Helicopter

In late March, the Army accepted delivery of the 100th AH-64E Apache helicopter.

The "Echo" model is a complete rebuild of the AH-64D model. It includes an improved drive system, composite main rotor blades, a more powerful 701D GE engine, is fully digitized, and has level-4 manned-unmanned teaming, which allows pilots to control unmanned aerial systems - such as the Gray Eagle.

The Echo model, "can fly higher, faster and further than the D model - and the D model is an extremely capable aircraft," said Col. Jeffrey Hager, the Apache project manager.

Hager spoke, March 31, during a media event at the Army Aviation Association of America conference in Nashville, Tennessee.

"But this aircraft outperforms and outdoes the Delta model to date," Hager said. "The enemy continually [was] thrown off-base because the Echo showed up to combat operations well before the Delta could have under the same conditions."

The AH-64E's recent success came in Afghanistan with the 1-229th Attack Reconnaissance Battalion, or ARB, out of Joint Base Lewis-McChord, Washington. The unit was the first to be fielded with the aircraft.

"They flew nearly 11,000 combat hours - that's absolutely phenomenal for what we have done with the Echo - since it's a brand new airframe," he said. "The enemy had to change up their combat operations in order to combat the effectiveness of the Echo model."

Hager said the 1-101st ARB out of Fort Campbell, Kentucky, will continue with that success when they replace the 1-229th in Afghanistan later this fiscal year. The 1-25th ARB has also been fielded with the AH-64E Apache. And already, training coordination has begun for the fourth unit to be equipped with the aircraft, the 3-301st ARB, out of Fort Campbell, Kentucky.

The Echo model has maintained 80 percent operational readiness rates, whether in combat or in peacetime operations, Hager said.

The Army plans to have an all-Echo model Apache fleet, for a total of 690 aircraft.

(U.S. Army Image)

FMI: www.army.mil

Advertisement

More News

ANN's Daily Aero-Linx (05.04.24)

Aero Linx: JAARS Nearly 1.5 billion people, using more than 5,500 languages, do not have a full Bible in their first language. Many of these people live in the most remote parts of>[...]

NTSB Final Report: Quest Aircraft Co Inc Kodiak 100

'Airplane Bounced Twice On The Grass Runway, Resulting In The Nose Wheel Separating From The Airplane...' Analysis: The pilot reported, “upon touchdown, the plane jumped back>[...]

Aero-News: Quote of the Day (05.04.24)

"Burt is best known to the public for his historic designs of SpaceShipOne, Voyager, and GlobalFlyer, but for EAA members and aviation aficionados, his unique concepts began more t>[...]

Aero-News: Quote of the Day (05.05.24)

"Polaris Dawn, the first of the program’s three human spaceflight missions, is targeted to launch to orbit no earlier than summer 2024. During the five-day mission, the crew >[...]

Read/Watch/Listen... ANN Does It All

There Are SO Many Ways To Get YOUR Aero-News! It’s been a while since we have reminded everyone about all the ways we offer your daily dose of aviation news on-the-go...so he>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC