First Hubble Hardware Arrives At KSC For STS-125 Flight | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Fri, Jul 18, 2008

First Hubble Hardware Arrives At KSC For STS-125 Flight

Scheduled For October 8 Liftoff

The first major flight hardware for the fifth and final space shuttle servicing mission to NASA's Hubble Space Telescope is starting to arrive at the Kennedy Space Center, FL to begin preparations for its targeted October launch.

Three carriers, which are pallets that will hold equipment in space shuttle Atlantis' payload bay, were delivered to Kennedy Wednesday. They will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during Atlantis' mission, designated STS-125 and SM4.

The three payload carriers are the Flight Support System (FSS), the Super Lightweight Interchangeable Carrier (SLIC), and the Orbital Replacement Unit Carrier (ORUC). At the end of July, a fourth and final carrier, the Multi-Use Lightweight Equipment (MULE) carrier, will join the others in the Payload Hazardous Servicing Facility where the Hubble payload is being prepared for launch.

The Flight Support System will attach, secure and provide power to Hubble and also contains the Soft Capture Mechanism that will assist in the de-orbiting of the telescope when its science mission is over.

Among the components to be integrated onto the carriers are the Wide Field Camera 3 that will be placed on the SLIC with Hubble's two new battery modules. The Fine Guidance Sensor and the Cosmic Origins Spectrograph will be on the ORUC, as well as the replacement gyros.

The Relative Navigation Sensors and the New Outer Blanket Layers will be on the MULE. These components, which will be integrated onto the carriers, will be delivered to Kennedy during the first half of August.

Numerous crew aids and tools that the astronauts will use during their five planned spacewalks also will be integrated onto the carriers. The new hardware will ensure Hubble is at the apex of its scientific capability and that it functions efficiently for a minimum of five more years.

The processing and integration of the Hubble flight hardware will take approximately two months. The payload is scheduled to go to Launch Pad 39A in mid-September to be installed into Atlantis' payload bay.

Atlantis is targeted to launch October 8 at 0134 EDT.

FMI: www.nasa.gov/hubble

Advertisement

More News

ANN's Daily Aero-Linx (05.02.24)

Aero Linx: Model Aeronautical Association of Australia MAAA clubs are about fun flying, camaraderie and community. For over 75 years, the MAAA has been Australia’s largest fl>[...]

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

NTSB Final Report: Cirrus Design Corp SR20

Student Pilot Reported That During Rotation, “All Of A Sudden The Back Of The Plane Kicked To The Right..." Analysis: The student pilot reported that during rotation, “>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC