Bombardier Suspending Production of CRJ200 -- Temporarily | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Fri, Oct 28, 2005

Bombardier Suspending Production of CRJ200 -- Temporarily

Bombardier announced that, as of mid-January 2006, it will temporarily suspend the production of its CRJ200 aircraft to realign its production to the current market outlook for 50-seat regional jets. Production of the Challenger 850 business aircraft, the corporate variant of the CRJ200, will continue on the existing assembly line.

The total number of Bombardier aircraft deliveries for the fiscal year 2005/06 will remain, as planned, approximately the same as last fiscal year. Production of the Challenger 850 business aircraft, derived from the CRJ200 platform, is not affected.

Bombardier will also resume production of its world-renowned Bombardier 415 amphibious firefighting aircraft to meet expected demand in the coming years.

The impact on the level of employment from the temporary suspension of the CRJ200 production will result in the implementation of the remaining 660 of the 1,135 layoffs announced last August. These layoffs will take place at Bombardier's Montreal-area and Belfast facilities, starting in November 2005.

The total number of layoffs is mitigated by the new production of Bombardier 415 and the positive effect of increased Bombardier business aircraft deliveries. The total number of Bombardier aircraft deliveries for this fiscal year 2005/06 will remain, as planned, approximately the same as last fiscal year.

"In the last 13 years, the CRJ200 aircraft's success has been a great asset for Bombardier. However, the combination of increased passenger traffic, lower yields and more relaxed pilot scope clauses are driving regional airlines toward larger capacity aircraft. With our well-established customer base and regional aircraft such as the CRJ700/CRJ900 jets and Q400 turboprops offering outstanding economics, we are ready to capitalize on these market trends. We must, however, continue to manage our production schedule to remain competitive and achieve our goal of increased profitability. This means making difficult but necessary decisions," said Pierre Beaudoin, President and Chief Operating Officer, Bombardier Aerospace.

"We continue to profit from a strong business aircraft market with our leading line up of innovative business jets. This fiscal year, in the second quarter alone, deliveries of Bombardier business jets increased by 41 per cent and net orders by 63 per cent over the same period last year," added Mr. Beaudoin.

FMI: www.bombardier.com

Advertisement

More News

Aero-News: Quote of the Day (05.09.24)

"Fly-by-wire flight, coupled with additional capability that are being integrated into ALFA, provide a great foundation for Bell to expand on its autonomous capabilities. This airc>[...]

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Linx (05.09.24)

Aero Linx: B-21 Raider The B-21 Raider will be a dual-capable penetrating strike stealth bomber capable of delivering both conventional and nuclear munitions. The B-21 will form th>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC