AD: Hoffmann GmbH & Co. KG Propellers | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Fri, Oct 12, 2018

AD: Hoffmann GmbH & Co. KG Propellers

AD NUMBER: 2018-20-03

PRODUCT: Certain Hoffmann GmbH & Co. KG model HO-V 62 propellers.

ACTION: Final Rule.

SUMMARY: This AD was prompted by the failure of the propeller blade lag screws.

This AD requires removal of the affected propeller blades and installation of modified propeller blades marked with change letter “A” or “B.”

DATES: This AD is effective November 14, 2018.

COST: The FAA estimates that this AD affects 50 propellers installed on airplanes of U.S. registry. The cost of compliance is estimated as follows:

  • Replace blades between overhaul - 3 work-hours × $85 per hour = $255 Parts - $3,150. Cost per aircraft - $3,405.
  • Replace blades at overhaul - 0 work-hours × $85 per hour = $0 Parts - $3,150, Cost per aircraft $3,150.
FMI: AD

Advertisement

More News

ANN's Daily Aero-Linx (05.02.24)

Aero Linx: Model Aeronautical Association of Australia MAAA clubs are about fun flying, camaraderie and community. For over 75 years, the MAAA has been Australia’s largest fl>[...]

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

NTSB Final Report: Cirrus Design Corp SR20

Student Pilot Reported That During Rotation, “All Of A Sudden The Back Of The Plane Kicked To The Right..." Analysis: The student pilot reported that during rotation, “>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC