Scrubbed! Hydrogen Leak Postpones STS-127 Launch | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Sat, Jun 13, 2009

Scrubbed! Hydrogen Leak Postpones STS-127 Launch

Gaseous Hydrogen Leak Creates Launch Hazard

A gaseous hydrogen leak on a vent line for space shuttle Endeavour is postponing Saturday morning's launch of Endeavour. The official scrub time was 0026 EDT. Launch teams began draining Endeavour's external fuel tank of its liquid hydrogen and liquid oxygen at 0006.

Fueling was halted after the leak was detected near the Ground Umbilical Carrier Plate, or GUCP, which attached to the external tank at its intertank area. The line leads from the GUCP back to the launch pad and to the "flare stack" where vented gaseous hydrogen is burned off.

The leak is similar to what happened during the first launch attempt of space shuttle Discovery's STS-119 mission in March.

After the leak is assessed, shuttle managers plan to meet Saturday morning to discuss what steps to take next, including targeting a new launch date for Endeavour's STS-127 mission to the International Space Station, though current estimates indicate that another launch attempt is at least 96 hours off.

Mission STS-127 is the 32nd flight dedicated to station construction, and the final of a series of three flights dedicated to the assembly of the Japanese Kibo laboratory complex.The STS-127 payload is the Kibo Japanese Experiment Module Exposed Facility and Experiment Logistics Module Exposed Section.

FMI: www.nasa.gov

Advertisement

More News

Aero-News: Quote of the Day (05.09.24)

"Fly-by-wire flight, coupled with additional capability that are being integrated into ALFA, provide a great foundation for Bell to expand on its autonomous capabilities. This airc>[...]

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Linx (05.09.24)

Aero Linx: B-21 Raider The B-21 Raider will be a dual-capable penetrating strike stealth bomber capable of delivering both conventional and nuclear munitions. The B-21 will form th>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC