ISS Cooling System Repairs Complete | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Mon, Aug 16, 2010

ISS Cooling System Repairs Complete

Third Spacewalk Finishes Installation Of Spare Ammonia Pump

Flight Engineers Doug Wheelock and Tracy Caldwell Dyson completed the third contingency spacewalk to install a spare ammonia pump module on the S1 Truss at 1340 EDT Monday. Flight Engineer Shannon Walker assisted the spacewalkers from inside the International Space Station and operated the Canadarm2.


NASA Image

The 780-pound spare pump module was removed from an external stowage platform by Wheelock while working from the Canadarm2. The module was successfully installed on the S1 Truss after Wheelock attached four bolts and Caldwell Dyson mated five electrical connectors.

Ground controllers confirmed the module was in healthy condition when it began receiving power. After a pressure check and more fluid cable connections, the module was filled with ammonia.

Wheelock and Caldwell Dyson were outside during the third repair spacewalk for 7 hours, 20 minutes. On Wednesday they were outside during the second spacewalk for 7 hours, 26 minutes. The first repair spacewalk took place Aug. 7 and lasted a record 8 hours, 3 minutes.

After the original pump module failed July 31 ground controllers powered down numerous station systems and readjusted them to provide maximum redundancy. Mission managers and astronauts on the ground also quickly began choreographing the contingency spacewalks and planning repair procedures. The spacewalks were planned several days apart to give crew members time to rest and managers on the ground time to review data and make necessary adjustments.

The spare ammonia pump installed was delivered aboard space shuttle Discovery and stowed on an external stowage platform in July 2006. STS-121 Mission Specialists Piers Sellers and Mike Fossum performed the transfer work during a 6-hour, 47-minute spacewalk.

FMI: www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Linx (05.02.24)

Aero Linx: Model Aeronautical Association of Australia MAAA clubs are about fun flying, camaraderie and community. For over 75 years, the MAAA has been Australia’s largest fl>[...]

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

NTSB Final Report: Cirrus Design Corp SR20

Student Pilot Reported That During Rotation, “All Of A Sudden The Back Of The Plane Kicked To The Right..." Analysis: The student pilot reported that during rotation, “>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC