FAA Prepares AD For Boeing 737 Leading Edge Slats | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Tue, Jun 04, 2019

FAA Prepares AD For Boeing 737 Leading Edge Slats

Company Informs The Agency That Some Slat Tracks May Have Been Improperly Manufactured

Boeing has informed the FAA that certain 737NG and 737MAX leading edge slat tracks may have been improperly manufactured and may not meet all applicable regulatory requirements for strength and durability.

Following an investigation conducted by Boeing and the FAA Certificate Management Office (CMO), the FAA has determined that up to 148 parts manufactured by a Boeing sub-tier supplier are affected. Boeing has identified groups of both 737NG and 737MAX airplane serial numbers on which these suspect parts may have been installed. 32 NG and 33 MAX are affected in the U.S. Affected worldwide fleet are 133 NG and 179 MAX aircraft.

The affected parts may be susceptible to premature failure or cracks resulting from the improper manufacturing process. Although a complete failure of a leading edge slat track would not result in the loss of the aircraft, a risk remains that a failed part could lead to aircraft damage in fight.

According to Boeing, Slat tracks are used to guide the slats located on the leading edge of an airplane’s wings. Boeing has not been informed of any in-service issues related to this batch of slat tracks.

Boeing is now staging replacement parts at customer bases to help minimize aircraft downtime while the work is completed. Once the new parts are in hand, the replacement work should take one to two days. Boeing will also issue a safety service bulletin outlining the steps to take during the inspections.

The FAA will issue an Airworthiness Directive to mandate Boeing's service actions to identify and remove the discrepant parts from service. Operators of affected aircraft are required to perform this action within 10 days. The FAA today also alerted international civil aviation authorities of this condition and required actions.

(Source: FAA and Boeing news releases. Image from file)

FMI: www.faa.gov
www.boeing.com

Advertisement

More News

ANN's Daily Aero-Term (04.26.24): DETRESFA (Distress Phrase)

DETRESFA (Distress Phrase) The code word used to designate an emergency phase wherein there is reasonable certainty that an aircraft and its occupants are threatened by grave and i>[...]

ANN's Daily Aero-Linx (04.26.24)

Aero Linx: The International Association of Missionary Aviation (IAMA) The International Association of Missionary Aviation (IAMA) is comprised of Mission organizations, flight sch>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne-NextGen 04.23.24: UAVOS UVH 170, magni650 Engine, World eVTOL Directory

Also: Moya Delivery Drone, USMC Drone Pilot, Inversion RAY Reentry Vehicle, RapidFlight UAVOS has recently achieved a significant milestone in public safety and emergency services >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC